Pervomaiska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
5
Projects
Projects by sectors
5
Projects
Projects by goal
5
Projects
Projects by status
414,58 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date11. 2025
SectorMunicipal infrastructure and services
SubsectorDevelopment and Reconstruction of Subnational Infrastructure
StatusInvestment Feasibility Study

"Reconstruction of the water supply system in the village of Rzhavchyk, Lozov district, Kharkiv region" Code DK 45454000-4 Reconstruction"

Project goal
Increasing compliance with modern standards. Contribution to climate or environmental goals, Increasing compliance with modern standards, Improving the equality of wealth distribution, Improving the condition of infrastructure, Introducing innovations and energy-efficient solutions, Meeting demand
Geography
Pervomaiskyi city, Rzhavchyk village
Initiator
Housing and Communal Services Department of the Executive Committee of the Zlatopil City Council of the Kharkiv Region
Reconstruction of the water supply system in the village of Rzhavchyk, Lozov district, Kharkiv region» Code DK 45454000-4 Reconstruction
"Overhaul of the water supply system in the village of Rzhavchyk, Lozov district, Kharkiv region"
When carrying out work on the reconstruction of the water supply system, the following is envisaged: - reconstruction of the water supply system in the village of Rzhavchyk, Lozov district, Kharkiv region. Pipeline material – PE100 SDR17 ⌀110x6.6 mm, length 12122.3 m;- installation of a puncture for a/d by horizontal drilling from a PE-100 SDR26 pipe O280x10.7 mm – 86 m (8 pcs.);- installation of a culvert for crossing a swampy area by horizontal drilling from a PE-100 SDR26 pipe O280x10.7 mm – 891.4 m (3x2 pcs.);- laying of a casing by open method from PE-100 SDR26 pipes O280x10.7 mm at the places of crossing of a highway and intersection of the designed network with a gas pipeline – 517 m (89 pcs.);- reconstruction of the water pipeline is carried out without stopping the operation of the existing water pipeline with the laying of a new one (at a depth of at least 1.5 m) above the existing or next to the existing pipeline without it dismantling.;-installation of water supply wells with a diameter of 1500 mm - 20 pcs, 1000 mm - 5 pcs, namely: Type I, the project provides for a 1500 mm well with a 100 mm valve and a driven hydrant; Type II, VII, the project provides for a 1500 mm well with two valves on the branch of 100 mm and a driven hydrant; Type III, the project provides for a 1500 mm well with two valves on the branch of 100 mm; Type IV, the project provides for a 1500 mm well with a 100 mm valve and a 100 mm air plunger; Type V, the project provides for a 1500 mm well with a 100 mm valve for emptying the network; Type VI, the project provides for a well 1000 mm for receiving water from the network emptying; - the project provides for the installation of concrete stops in wells under the valves with the installation of necks and complete internal waterproofing of the walls (type VI), external waterproofing of the walls (Type I - Type VII); As a result of the reconstruction of water supply networks, the quality indicators of water supply to consumers will be improved and the following results will be obtained: - minimizing the frequency of pipeline damage and accidents; - reducing energy loss and energy resources by installing new equipment; - providing the consumer with uninterrupted and high-quality water supply services.
Budget32'194'889 UAH
Implementation period8 months
Local level of SPP
Local level of SP
Date12. 2025
SectorEnergy Sector
SubsectorElectric power industry
StatusInvestment Feasibility Study

Implementation of a distributed generation system for the purpose of uninterrupted and sustainable supply of thermal energy in the city of Zlatopil, Kharkiv region

Project goal
Introducing innovations and energy-efficient solutions. Contribution to climate or environmental goals, Increasing compliance with modern standards, Increasing compliance with modern standards, Creation of new facilities and services, Improving the equality of wealth distribution, Increasing the even distribution of resources, Improving the condition of infrastructure, Improving the quality of services, Meeting demand
Geography
Pervomaiskyi city
Initiator
Housing and Communal Services Department of the Executive Committee of the Zlatopil City Council of the Kharkiv Region
Implementation of a distributed generation system for the purpose of uninterrupted and sustainable supply of thermal energy in the city of Zlatopil, Kharkiv region
Backup power supply of boiler rooms based on diesel generators with modernization of automatic reserve input systems (ATS)
Project Implementation of a distributed generation system for the purpose of uninterrupted and sustainable supply of thermal energy in the city of Zlatopil, Kharkiv region. In the city of Zlatopil, there is a heat supply scheme consisting of 12 boiler houses, six of which serve the majority of the city's population, social infrastructure facilities and businesses. The operability of these boiler houses is of great social importance. Given the constant threats of power outages in the power grid, which may lead to a shutdown of heat supply, the community purchased diesel generators at its own expense to operate the aforementioned boiler houses during scheduled power outages. The next step in increasing the system's stability and energy independence is the installation of cogeneration units for own consumption at the city's boiler houses. Thanks to long-term cooperation with Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH on the project "Strengthening the Resilience of Cities in the Sphere of Life Support of Urban Territorial Communities in Ukraine" (SUR) the community received six cogeneration units (CHPs), which will help strengthen the community's infrastructure during the heating season. In addition to receiving CHPs, it is necessary to design their installation and connection to the networks and finance the work on installing CHPs. Given the high expected cost of these works, the community is looking for an opportunity to attract funds from various sources of financing. As part of the request for this project, it is planned to finance the development of design and estimate documentation and the construction of six backup sources of heat and electricity generation at the following addresses: - brand of cogeneration unit SES-HPC70 with a nominal electric capacity of 70 kW on the territory of boiler house No. 1 at the address of Zlatopil, ½ m-n, b.21G; - brand of cogeneration unit SES-HPC70 with a nominal electric capacity of 70 kW on the territory of boiler house No. 2 at the address of Zlatopil, 3 m-n, b.36A; - brand of cogeneration unit CHP unit GG 140 with a nominal electric power of 142 kW on the territory of boiler house No. 3 at the address of Zlatopil, 3rd district, building 37; - brand of cogeneration unit CHP unit GG 140 with a nominal electric power of 142 kW on the territory of boiler house No. 4 at the address of Zlatopil, 4th district, building 31; - brand of cogeneration unit SES-HPC70 with a nominal electric power of 70 kW on the territory of boiler house No. 5 at the address of Zlatopil, 6th district, building 27; - brand of cogeneration unit SES-HPC70 with a nominal electric power of 70 kW on the territory of UKTM-1 at the address of Zlatopil, ½ district, building 81. In the future, the land plot will be divided for the installation of a CHP, which is in the use of the KP "Teplomerezhy". This is a strategic project aimed at increasing energy efficiency, reducing energy costs and reducing the environmental impact on the environment. The use of cogeneration plants allows for the simultaneous production of thermal and electrical energy, which increases the overall efficiency of energy processes and reduces operating costs.
Budget34'160'000 UAH
Implementation period7 months
State level of SP
Local level of SPP
Local level of SP
Date12. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

New construction of a civil defense protective structure (radiation shelter) on the territory of the municipal institution "Zlatopil Lyceum No. 2 of the Zlatopil City Council of the Kharkiv region" located at the address: 64102, Kharkiv region, Lozovsky district, Zlatopil city, Centralna st., building 2-a

Project goal
Increasing compliance with modern standards. Improving the condition of infrastructure, Introducing innovations and energy-efficient solutions, Meeting demand
Geography
Pervomaiskyi city
Initiator
Education Department of the Executive Committee of the Zlatopil City Council of the Kharkiv Region
New construction of a protective structure of civil defense (anti-radiation shelter)
Use of prefabricated reinforced concrete or metal modules on the territory of the municipal institution "Zlatopil Lyceum No. 2 of the Zlatopil City Council of the Kharkiv Region"
The protective structure (radiation shelter) is designed to ensure accessibility for people with disabilities and other low-mobility groups in accordance with the requirements of DBN V.2.2-40. The construction of the PRU will provide a safe space for students, teaching staff and technical personnel of the institution, who will be able to continue their studies and work process during shelling and emergency situations.
Budget199'045'287 UAH
Implementation period12 months
State level of SP
Local level of SPP
Local level of SP
Date12. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

New construction of a protective civil defense structure (radiation shelter) on the territory of the municipal institution "Pervomaisky Lyceum No. 3 "Success" of the Pervomaisky City Council of the Kharkiv region" located at: 64107, Kharkiv region, Lozovsky district, Pervomaisky city, Sportivna street, 34

Project goal
Improving the condition of infrastructure. Increasing compliance with modern standards, Improving the equality of wealth distribution, Ensuring inclusiveness and equal opportunities
Geography
Pervomaiska community, Pervomaiskyi city
Initiator
Executive Committee of the Zlatopil City Council of Kharkiv Region
New construction of a protective civil defense structure (radiation shelter) on the territory of the municipal institution "Pervomaisky Lyceum No. 3 "Success" of the Pervomaisky City Council of the Kharkiv region" located at: 64107, Kharkiv region, Lozovsky district, Pervomaisky city, Sportivna street, 34
Reconstruction and adaptation of the existing basement premises of the lyceum for a civil defense protective structure (radiation shelter)
The project involves the construction of a new civil defense protective structure — anti-radiation shelter — on the territory of the municipal institution «Pervomaisky Lyceum No. 3 «Uspikh» of the Pervomaisky City Council of the Kharkiv region at the address: 64107, Kharkiv region, Lozov district, Pervomaisky city, Sportivna st., 34. The goal of the project is to ensure the safety of students and employees of the educational institution in conditions of military threats and emergencies by creating a modern, reliable and normatively justified shelter. The implementation of the project will allow solving the problem of the lack of sufficient protective space that meets the requirements of current building codes and civil defense standards. The expected results are to increase the level of protection of children and staff of the lyceum, ensure the continuity of the educational process even in crisis conditions, as well as strengthen the overall security and stability of the social infrastructure of the community.
Budget149'184'476 UAH
Implementation period10 months
Local level of SPP
Local level of SP
Date01. 2026
SectorMunicipal infrastructure and services
SubsectorDistrict Heating
StatusInvestment Feasibility Study

Reconstruction of the gas supply system of residential buildings

Project goal
Rebuilding the damaged/destroyed. Improving the equality of wealth distribution, Improving the condition of infrastructure, Improving the quality of services
Geography
Pervomaiskyi city
Initiator
Housing and Communal Services Department of the Executive Committee of the Zlatopil City Council of the Kharkiv Region
Reconstruction of the gas supply system of residential buildings
Current repairs of existing gas distribution networks
Reconstruction of the gas supply system of residential buildings
Budget2'000'000 UAH
Implementation period13 months

In focus