Project Implementation of a distributed generation system for the purpose of uninterrupted and sustainable supply of thermal energy in the city of Zlatopil, Kharkiv region. In the city of Zlatopil, there is a heat supply scheme consisting of 12 boiler houses, six of which serve the majority of the city's population, social infrastructure facilities and businesses. The operability of these boiler houses is of great social importance. Given the constant threats of power outages in the power grid, which may lead to a shutdown of heat supply, the community purchased diesel generators at its own expense to operate the aforementioned boiler houses during scheduled power outages. The next step in increasing the system's stability and energy independence is the installation of cogeneration units for own consumption at the city's boiler houses. Thanks to long-term cooperation with Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH on the project "Strengthening the Resilience of Cities in the Sphere of Life Support of Urban Territorial Communities in Ukraine" (SUR) the community received six cogeneration units (CHPs), which will help strengthen the community's infrastructure during the heating season. In addition to receiving CHPs, it is necessary to design their installation and connection to the networks and finance the work on installing CHPs. Given the high expected cost of these works, the community is looking for an opportunity to attract funds from various sources of financing. As part of the request for this project, it is planned to finance the development of design and estimate documentation and the construction of six backup sources of heat and electricity generation at the following addresses: - brand of cogeneration unit SES-HPC70 with a nominal electric capacity of 70 kW on the territory of boiler house No. 1 at the address of Zlatopil, ½ m-n, b.21G; - brand of cogeneration unit SES-HPC70 with a nominal electric capacity of 70 kW on the territory of boiler house No. 2 at the address of Zlatopil, 3 m-n, b.36A; - brand of cogeneration unit CHP unit GG 140 with a nominal electric power of 142 kW on the territory of boiler house No. 3 at the address of Zlatopil, 3rd district, building 37; - brand of cogeneration unit CHP unit GG 140 with a nominal electric power of 142 kW on the territory of boiler house No. 4 at the address of Zlatopil, 4th district, building 31; - brand of cogeneration unit SES-HPC70 with a nominal electric power of 70 kW on the territory of boiler house No. 5 at the address of Zlatopil, 6th district, building 27; - brand of cogeneration unit SES-HPC70 with a nominal electric power of 70 kW on the territory of UKTM-1 at the address of Zlatopil, ½ district, building 81. In the future, the land plot will be divided for the installation of a CHP, which is in the use of the KP "Teplomerezhy". This is a strategic project aimed at increasing energy efficiency, reducing energy costs and reducing the environmental impact on the environment. The use of cogeneration plants allows for the simultaneous production of thermal and electrical energy, which increases the overall efficiency of energy processes and reduces operating costs.
Budget34'160'000 UAH
Implementation period7 months