The project has been ongoing since 2024 and involves major repairs to the therapeutic building "A1-1" of the "Zborivskaya Hospital" KNP, located at: Zboriv, 17 B. Khmelnytskyi St. The building is one-story with a partial basement, with outdated structural elements and engineering networks that require modernization. The project includes a comprehensive renovation of the building, including: strengthening the foundations and walls, replacing the roof and roofing, insulating facades and ceilings, replacing windows and doors with energy-efficient ones, upgrading engineering networks (electricity, plumbing, ventilation), internal redevelopment of premises, finishing and replacing floors. It also includes the installation of a ramp, fire protection systems and lightning protection, which will ensure compliance with modern safety and inclusion requirements. The implementation of the project will increase the energy efficiency of the building, create comfortable and safe conditions for patients and medical staff, and ensure the accessibility of the facility for people with limited mobility in accordance with current building codes.
The project will take another 6 months to complete.
Project cost19'400'000 UAH
Implementation period7 months