Zborivska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
All streams
1
Projects
Projects by sectors
1
Projects
Projects by goal
1
Projects
Projects by status
12,15 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status

Current set filters (Filtered result: 1)

Project code: 131125-20EFC3E5
Initiation date
Budget
Status
State level of SP
Local level of SPP
Local level of SP
Date11. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Renovation of the catering unit and the "basic kitchen" dining room of the 1st-3rd grade secondary school No. 2, Zboriv

Project Goal
Improving the quality of services. Increasing compliance with modern standards, Improving the equality of wealth distribution, Improving the condition of infrastructure, Introducing innovations and energy-efficient solutions
Geography
Ternopilska region
Initiator
DEPARTMENT OF EDUCATION, CULTURE, YOUTH AND SPORTS, LABOR AND SOCIAL PROTECTION OF THE POPULATION OF ZBORIV CITY COUNCIL
Maturity level
90
Major renovation of the catering unit and the "basic kitchen" dining room of the 1st-3rd grade secondary school No. 2 in Zboriv, at the address: 7 Bohdana Khmelnytskyi St., Zboriv, Ternopil district, Ternopil region
Reconstruction with expansion (addition of individual rooms)
This project provides for a major overhaul without changing the external geometric parameters of the building, without redevelopment and interference with the main structural scheme of the building, as it corresponds to the functional zoning and technological feasibility of production processes. The catering unit and the dining room "basic kitchen", which are located on the first floor of a three-story building, are subject to major repairs. The project includes the repair of walls, floors and ceilings, replacement of doors, parts of windows, installation of technological equipment in the school part of the catering unit and dining room.
Project cost11'400'000 UAH
Implementation period18 months

In focus

All news