Kostopilska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
1
Projects
Projects by sectors
1
Projects
Projects by goal
1
Projects
Projects by status
14,28 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status

Current set filters (Filtered result: 1)

Project code: 011025-C7B0A502
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date10. 2025
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

Overhaul of the anti-radiation shelter

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Improving the condition of infrastructure
Geography
Kostopil city
Initiator
MUNICIPAL NON-COMMERCIAL ENTERPRISE "KOSTOPOL MULTIPROFILE HOSPITAL OF INTENSIVE TREATMENT" OF KOSTOPOL CITY COUNCIL
Maturity level
81
Overhaul of the anti-radiation shelter
Construction of a new civil defense facility
Propose a major overhaul of the existing radiation shelter No. 66027, located in the basement of building No. 2 (hospital building with an outpatient department) of the municipal non-profit enterprise "Kostopil Multidisciplinary Hospital for Intensive Care" of the Kostopil City Council. In peacetime, the premises of the protective structure are intended to be used as an outbuilding of the institution. Electricity supply - from the electrical panel building of building No. 2 in the basement after the metering unit, Power reserve is 60.0 kW. Provide for the installation of an automatic transfer switch for switching from the existing DPP. Water supply - from the water supply network of the institution in the basement after the metering unit Drainage - discharge into the existing gravity sewer network of building No. 2 Heating supply - provide a separate branch of power supply for the shelter premises with its connection to the existing comb in the entrance node of building No. 2. Additionally, as a backup source of heating, provide electric heaters. Provide for the installation of a blind area made of FEM tiles along the perimeter of the building in the volume of the shelter premises. Provide for the implementation of the necessary fire prevention measures for the designed PRU External fire extinguishing is provided from existing fire hydrants located on the territory of the facility Duration of construction - 6 months
Project cost12'783'761 UAH
Implementation period7 months