Kostopilska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
14
Projects
Projects by sectors
14
Projects
Projects by goal
14
Projects
Projects by status
246,71 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date03. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Creation of an educational space within the framework of the "New Ukrainian School" reform of the Kostopil urban territorial community

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Improving the quality of services
Geography
Kostopil city
Initiator
EDUCATION DEPARTMENT OF KOSTOPOL CITY COUNCIL
Maturity level
71
Purchase of teaching aids and equipment within the framework of the implementation of the "New Ukrainian School" reform
Carrying out current repairs of natural science laboratories
Purchase of modern teaching aids and equipment for four science classrooms in three lyceums (two biology classrooms, one chemistry classroom, and one physics classroom), which will receive the status of gymnasiums in 2027. The goal is to create an innovative, safe, and materially and technically equipped educational environment in accordance with the standards of the New Ukrainian School, which will contribute to the high-quality teaching of science subjects and the development of key competencies of students.
Project cost3'144'700 UAH
Implementation period5 months
Local level of SPP
Local level of SP
Date10. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Major repairs of Kostopil Lyceum No. 6

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Ensuring inclusiveness and equal opportunities, Introducing innovations and energy-efficient solutions
Geography
Kostopil city
Initiator
KOSTOPOL LYCEUM №6 OF KOSTOPOL CITY COUNCIL
Maturity level
81
Major repairs of Kostopil Lyceum No. 6 of the Kostopil City Council
New construction of a modern educational lyceum
Project cost6'796'000 UAH
Implementation period17 months
Local level of SPP
Local level of SP
Date10. 2025
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

Overhaul of the anti-radiation shelter

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Improving the condition of infrastructure
Geography
Kostopil city
Initiator
MUNICIPAL NON-COMMERCIAL ENTERPRISE "KOSTOPOL MULTIPROFILE HOSPITAL OF INTENSIVE TREATMENT" OF KOSTOPOL CITY COUNCIL
Maturity level
81
Overhaul of the anti-radiation shelter
Construction of a new civil defense facility
Propose a major overhaul of the existing radiation shelter No. 66027, located in the basement of building No. 2 (hospital building with an outpatient department) of the municipal non-profit enterprise "Kostopil Multidisciplinary Hospital for Intensive Care" of the Kostopil City Council. In peacetime, the premises of the protective structure are intended to be used as an outbuilding of the institution. Electricity supply - from the electrical panel building of building No. 2 in the basement after the metering unit, Power reserve is 60.0 kW. Provide for the installation of an automatic transfer switch for switching from the existing DPP. Water supply - from the water supply network of the institution in the basement after the metering unit Drainage - discharge into the existing gravity sewer network of building No. 2 Heating supply - provide a separate branch of power supply for the shelter premises with its connection to the existing comb in the entrance node of building No. 2. Additionally, as a backup source of heating, provide electric heaters. Provide for the installation of a blind area made of FEM tiles along the perimeter of the building in the volume of the shelter premises. Provide for the implementation of the necessary fire prevention measures for the designed PRU External fire extinguishing is provided from existing fire hydrants located on the territory of the facility Duration of construction - 6 months
Project cost12'783'761 UAH
Implementation period7 months
Local level of SPP
Local level of SP
Date10. 2025
SectorSocial sector
SubsectorVeterans
StatusInvestment Feasibility Study

Reconstruction of the premises of the children's dental clinic to create a Center for Support for War Veterans, Family Members of the Fallen Defenders of Ukraine

Project Goal
Creation of new facilities and services. Improving the equality of wealth distribution, Reducing territorial or social gaps, Meeting demand
Geography
Kostopilska community
Initiator
MUNICIPAL INSTITUTION "CENTER FOR PROVISION OF SOCIAL SERVICES" OF KOSTOPIL CITY COUNCIL
Maturity level
81
Reconstruction of the premises of the children's dental clinic to create a Center for Support for War Veterans, Family Members of the Fallen Defenders of Ukraine
New construction of a facility for veterans' space
Thanks to the implementation of this project, a support center for war veterans and family members of the fallen Defenders of Ukraine will be created. A modern center will be created with compliance with the requirements of barrier-free and accessibility for low-mobility groups
Project cost4'489'780 UAH
Implementation period27 months
Local level of SPP
Local level of SP
Date09. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Unhindered access to quality education - school bus

Project Goal
Improving the quality of services. Ensuring inclusiveness and equal opportunities
Geography
Kostopil city
Initiator
EDUCATION DEPARTMENT OF KOSTOPOL CITY COUNCIL
Maturity level
77
Providing educational institutions with school buses
purchasing more school buses for educational institutions
provides for the purchase of certified transport that meets modern safety and comfort standards. The implementation of this solution will allow to fill existing transport gaps, increase the level of transport safety and ensure equal access of students to education
Project cost10'900'000 UAH
Implementation period10 months
State level of SP
Local level of SPP
Local level of SP
Date09. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Overhaul of the canteen

Project Goal
Increasing compliance with modern standards. Improving the condition of infrastructure, Introducing innovations and energy-efficient solutions
Geography
Kostopilska community, Kostopil city
Initiator
KOSTOPOL LYCEUM №6 OF KOSTOPOL CITY COUNCIL
Maturity level
77
Overhaul of the canteen
Comprehensive repair of the catering unit (alternative)
Complete modernization of premises and equipment for safe and efficient food preparation. Ensuring renewed sanitary standards, comfort for staff and energy efficiency
Project cost4'540'191 UAH
Implementation period18 months
Local level of SPP
Local level of SP
Date09. 2025
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

Reconstruction of the reception department and the department of anesthesiology and intensive care

Project Goal
Improving the condition of infrastructure. Increasing compliance with modern standards, Improving the quality of services
Geography
Kostopil city
Initiator
MUNICIPAL NON-COMMERCIAL ENTERPRISE "KOSTOPOL MULTIPROFILE HOSPITAL OF INTENSIVE TREATMENT" OF KOSTOPOL CITY COUNCIL
Maturity level
81
Reconstruction of the reception department and the department of anesthesiology and intensive care
Major renovation of the reception department and the department of anesthesiology and intensive care
The reception department and the department of anesthesiology and intensive care are located on the 1st floor of building No. 1 (hospital building with a catering unit) of the municipal non-profit enterprise "Kostopil Multidisciplinary Hospital of Intensive Care" of the Kostopil City Council at the address: 52A Stepanska St., Kostopil, Rivne District, Rivne Region. The proposed solution provides for the reconstruction of the reception department and the department of anesthesiology and intensive care, in accordance with the agreed general plan and the layout of technological equipment. It is envisaged: partial redevelopment of the premises of the departments in accordance with the agreed scheme to create better conditions for patients in the departments; reconstruction, without changing the main parameters of the building, of the existing entrance to the medical building for quick and unhindered transportation of patients by ambulances, and the arrangement of a ramp for the needs of low-mobility population groups; restoration of existing entrances to the departments to be reconstructed. Electricity supply - from the electrical panel building of building No. 1 after the metering unit. The power reserve is 60.0 kW. A new power network of the departments and a new lighting system of the premises to be reconstructed are planned. It is planned to install a system for calling medical personnel to patients (call buttons in the wards).Water supply (hot and cold water) - from the water supply network of the institution. It is planned to connect the designed sanitary appliances to the designed electric boilers, replace existing risers in the volume of the premises to be reconstructed. Additionally, it is planned to replace existing plumbing networks in the volume of basements under the designed departments. Drainage - discharge into the existing gravity sewer network of building No. 1. It is planned to connect to the existing risers in the designed department and replace the sewer risers within the premises to be repaired. Additionally, it is planned to replace the existing plumbing networks in the volume of the basements under the designed departments. Heat supply - it is planned to replace the heat supply system in the volume of the first floor. An air conditioning system is planned for the designed departments. The ventilation system is planned to be supply and exhaust using existing channels in the department premises. External fire extinguishing is planned from existing fire hydrants located on the territory of the institution. Landscaping and landscaping are planned. Construction duration - 8 months
Project cost24'893'594 UAH
Implementation period12 months
Local level of SPP
Local level of SP
Date09. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Major renovation of the building (roof repair) of the Malostydyn Lyceum of the Kostopil City Council

Project Goal
Introducing innovations and energy-efficient solutions. Increasing compliance with modern standards
Geography
Malyi Stydyn village
Initiator
MALOSTYDYN GYMNASIUM OF KOSTOPOL CITY COUNCIL
Maturity level
81
Major building renovation (roof repair)
Overhaul of the roof
The detailed design provides for a set of works, which includes: replacement of roofing material; replacement of part of the rafters, reduction of the distance between the rafters by installing additional rafters; installation of waterproofing; replacement of the batten; installation of a drainage system; installation of a lightning protection system.
Project cost4'186'430 UAH
Implementation period15 months
State level of SP
Local level of SPP
Local level of SP
Date09. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Reconstruction of building No. 3 of Kostopil Lyceum No. 1 named after T.G. Shevchenko for a dining room, a PRU and an assembly hall.

Project Goal
Increasing compliance with modern standards. Ensuring inclusiveness and equal opportunities, Introducing innovations and energy-efficient solutions, Improving the quality of services
Geography
Kostopil city
Initiator
KOSTOPOL LYCEUM №1 NAMED AFTER T.G.SHEVCHENKO OF KOSTOPOL CITY COUNCIL
Maturity level
75
Comprehensive modernization of building No. 3 for a dining room
Construction of the dining hall building of Kostopil Lyceum No. 1 named after T.G.Shevchenko
The project involves a major reconstruction of building No. 3 in order to re-equip it as a modern school cafeteria that will meet safety, hygiene and energy efficiency standards. The modernization includes: renovation of premises, facade insulation, roof renovation; installation of modern technological equipment for preparing safe and balanced food; arrangement of water supply, ventilation, electricity supply and fire safety systems; creation of comfortable conditions for feeding students, including children with disabilities; energy-saving technologies and conditions for inclusion are provided.
Project cost54'045'000 UAH
Implementation period44 months
Local level of SPP
Local level of SP
Date09. 2025
SectorSports and physical activities
SubsectorSports and physical activities
StatusInvestment Feasibility Study

Swimming pool at the Kostopil Youth and Sports School, Rivne region

Project Goal
Creation of new facilities and services. Improving the equality of wealth distribution, Improving the quality of services, Meeting demand
Geography
Kostopil city
Initiator
KOSTOPIL CHILDREN'S AND YOUTH SPORTS SCHOOL OF THE KOSTOPIL CITY COUNCIL
Maturity level
84
Swimming pool at the Kostopil Youth and Sports School, Rivne region
Construction of a swimming pool
Completion of work on the project "Construction of a physical education and health pool on the basis of the Kostopil Youth and Sports School at the address: Artyleriisky Lane 5a, Kostopil, Rivne region. Correction."
Project cost29'920'000 UAH
Implementation period7 months

In focus

All news