296,84 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date03. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Creation of an educational space within the framework of the "New Ukrainian School" reform of the Kostopil urban territorial community

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Improving the quality of services
Geography
Kostopil city
Initiator
EDUCATION DEPARTMENT OF KOSTOPOL CITY COUNCIL
Maturity level
71
Purchase of teaching aids and equipment within the framework of the implementation of the "New Ukrainian School" reform
Carrying out current repairs of natural science laboratories
Purchase of modern teaching aids and equipment for four science classrooms in three lyceums (two biology classrooms, one chemistry classroom, and one physics classroom), which will receive the status of gymnasiums in 2027. The goal is to create an innovative, safe, and materially and technically equipped educational environment in accordance with the standards of the New Ukrainian School, which will contribute to the high-quality teaching of science subjects and the development of key competencies of students.
Project cost3'144'700 UAH
Implementation period5 months
Local level of SP
Date11. 2025
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

Overhaul (replacement) of a hospital elevator

Project Goal
Increasing compliance with modern standards. Improving the equality of wealth distribution, Improving the condition of infrastructure, Ensuring inclusiveness and equal opportunities, Improving the quality of services
Geography
Kostopil city
Initiator
MUNICIPAL NON-COMMERCIAL ENTERPRISE "KOSTOPOL MULTIPROFILE HOSPITAL OF INTENSIVE TREATMENT" OF KOSTOPOL CITY COUNCIL
Hospital elevator replacement
hospital elevator repair
Perform major repairs and replace the hospital elevator in accordance with the detailed design: dismantling the old one and installing a new elevator, commissioning work, construction and finishing work, installation of the ODS
Project cost2'549'312 UAH
Implementation period5 months
Local level of SP
Date10. 2025
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

Major renovation of the hospital's neurological department

Project Goal
Increasing compliance with modern standards. Improving the condition of infrastructure, Ensuring inclusiveness and equal opportunities, Improving the quality of services
Geography
Kostopil city
Initiator
MUNICIPAL NON-COMMERCIAL ENTERPRISE "KOSTOPOL MULTIPROFILE HOSPITAL OF INTENSIVE TREATMENT" OF KOSTOPOL CITY COUNCIL
Major renovation of the neurological department
Current renovation of the neurological department
A major overhaul of the neurological department, located on the 1st floor of building No. 1 (hospital building with a catering unit) of the municipal non-profit enterprise "Kostopil Multidisciplinary Hospital for Intensive Care" of the Kostopil City Council in accordance with the provided defect acts, is planned. It is planned: partial redevelopment of the department premises in accordance with the agreed scheme to create better conditions for patients in the department; adaptation of the existing entrance to the medical building and the neurological department for the needs of low-mobility population groups; installation of a system for calling medical personnel to patients (call buttons in the wards); It is necessary to: close the existing network of underground channels in the department premises with the installation of necessary inspection hatches for servicing the networks in them; a new power network of the department and a new lighting system for the premises; provide water supply (hot and cold water) from the institution's water supply network. It is planned: connection of designed sanitary appliances to existing risers in the designed department; replacement of sewer risers within the premises to be repaired; partial replacement of the heating system in accordance with the provided defect certificate; supply and exhaust ventilation system using existing ducts in the department's premises.
Project cost7'719'594 UAH
Implementation period5 months
Local level of SPP
Local level of SP
Date10. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Major repairs of Kostopil Lyceum No. 6

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Ensuring inclusiveness and equal opportunities, Introducing innovations and energy-efficient solutions
Geography
Kostopil city
Initiator
KOSTOPOL LYCEUM №6 OF KOSTOPOL CITY COUNCIL
Maturity level
81
Major repairs of Kostopil Lyceum No. 6 of the Kostopil City Council
New construction of a modern educational lyceum
Project cost6'796'000 UAH
Implementation period17 months
Local level of SPP
Local level of SP
Date10. 2025
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

Overhaul of the anti-radiation shelter

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Improving the condition of infrastructure
Geography
Kostopil city
Initiator
MUNICIPAL NON-COMMERCIAL ENTERPRISE "KOSTOPOL MULTIPROFILE HOSPITAL OF INTENSIVE TREATMENT" OF KOSTOPOL CITY COUNCIL
Maturity level
81
Overhaul of the anti-radiation shelter
Construction of a new civil defense facility
Propose a major overhaul of the existing radiation shelter No. 66027, located in the basement of building No. 2 (hospital building with an outpatient department) of the municipal non-profit enterprise "Kostopil Multidisciplinary Hospital for Intensive Care" of the Kostopil City Council. In peacetime, the premises of the protective structure are intended to be used as an outbuilding of the institution. Electricity supply - from the electrical panel building of building No. 2 in the basement after the metering unit, Power reserve is 60.0 kW. Provide for the installation of an automatic transfer switch for switching from the existing DPP. Water supply - from the water supply network of the institution in the basement after the metering unit Drainage - discharge into the existing gravity sewer network of building No. 2 Heating supply - provide a separate branch of power supply for the shelter premises with its connection to the existing comb in the entrance node of building No. 2. Additionally, as a backup source of heating, provide electric heaters. Provide for the installation of a blind area made of FEM tiles along the perimeter of the building in the volume of the shelter premises. Provide for the implementation of the necessary fire prevention measures for the designed PRU External fire extinguishing is provided from existing fire hydrants located on the territory of the facility Duration of construction - 6 months
Project cost12'783'761 UAH
Implementation period7 months
Local level of SP
Date10. 2025
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

Major repairs of the civil defense building at the Kostopil Center for Civil Defense.

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Meeting demand
Geography
Kostopil city
Initiator
MUNICIPAL NON-COMMERCIAL ENTERPRISE "KOSTOPOL PRIMARY MEDICAL CARE CENTER" OF KOSTOPOL CITY COUNCIL
Comprehensive modernization of the existing shelter in a healthcare facility.
New construction of a modern PRU
The project involves the modernization of the existing shelter in a healthcare facility. It is planned to replace engineering systems: sewage, water, electricity, heating, waterproofing, replacing plumbing, performing internal work, etc. The implementation of this solution will ensure the creation of safe conditions for visitors to the facility
Project cost12'120'000 UAH
Implementation period18 months
Local level of SPP
Local level of SP
Date10. 2025
SectorSocial sector
SubsectorVeterans
StatusInvestment Feasibility Study

Reconstruction of the premises of the children's dental clinic to create a Center for Support for War Veterans, Family Members of the Fallen Defenders of Ukraine

Project Goal
Creation of new facilities and services. Improving the equality of wealth distribution, Reducing territorial or social gaps, Meeting demand
Geography
Kostopilska community
Initiator
MUNICIPAL INSTITUTION "CENTER FOR PROVISION OF SOCIAL SERVICES" OF KOSTOPIL CITY COUNCIL
Maturity level
81
Reconstruction of the premises of the children's dental clinic to create a Center for Support for War Veterans, Family Members of the Fallen Defenders of Ukraine
New construction of a facility for veterans' space
Thanks to the implementation of this project, a support center for war veterans and family members of the fallen Defenders of Ukraine will be created. A modern center will be created with compliance with the requirements of barrier-free and accessibility for low-mobility groups
Project cost4'489'780 UAH
Implementation period27 months
Local level of SPP
Local level of SP
Date09. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Unhindered access to quality education - school bus

Project Goal
Improving the quality of services. Ensuring inclusiveness and equal opportunities
Geography
Kostopil city
Initiator
EDUCATION DEPARTMENT OF KOSTOPOL CITY COUNCIL
Maturity level
77
Providing educational institutions with school buses
purchasing more school buses for educational institutions
provides for the purchase of certified transport that meets modern safety and comfort standards. The implementation of this solution will allow to fill existing transport gaps, increase the level of transport safety and ensure equal access of students to education
Project cost10'900'000 UAH
Implementation period10 months
Local level of SP
Date09. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Providing secondary education institutions with teaching and learning resources within the framework of the implementation of the "New Ukrainian School" reform

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards
Geography
Kostopil city
Initiator
EDUCATION DEPARTMENT OF KOSTOPOL CITY COUNCIL
Maturity level
71
Equipping educational institutions with multimedia equipment and interactive complexes
Creation of modern STEM laboratories in educational institutions
Provides equipment for secondary education institutions with multimedia equipment and interactive complexes to create a modern educational environment. The implementation of this option will allow equipping 45 classrooms at the National Secondary School with projectors, interactive whiteboards, computer equipment and appropriate software.
Project cost8'800'000 UAH
Implementation period10 months
State level of SP
Local level of SPP
Local level of SP
Date09. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Overhaul of the canteen

Project Goal
Increasing compliance with modern standards. Improving the condition of infrastructure, Introducing innovations and energy-efficient solutions
Geography
Kostopilska community, Kostopil city
Initiator
KOSTOPOL LYCEUM №6 OF KOSTOPOL CITY COUNCIL
Maturity level
77
Overhaul of the canteen
Comprehensive repair of the catering unit (alternative)
Complete modernization of premises and equipment for safe and efficient food preparation. Ensuring renewed sanitary standards, comfort for staff and energy efficiency
Project cost4'540'191 UAH
Implementation period18 months