Kostopilska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
All streams
1
Projects
Projects by sectors
1
Projects
Projects by goal
1
Projects
Projects by status
39,89 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status

Current set filters (Filtered result: 1)

Project code: 300925-4AB8B77A
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date09. 2025
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

Reconstruction of the reception department and the department of anesthesiology and intensive care

Project Goal
Improving the condition of infrastructure. Increasing compliance with modern standards, Improving the quality of services
Geography
Kostopil city
Initiator
MUNICIPAL NON-COMMERCIAL ENTERPRISE "KOSTOPOL MULTIPROFILE HOSPITAL OF INTENSIVE TREATMENT" OF KOSTOPOL CITY COUNCIL
Maturity level
81
Reconstruction of the reception department and the department of anesthesiology and intensive care
Major renovation of the reception department and the department of anesthesiology and intensive care
The reception department and the department of anesthesiology and intensive care are located on the 1st floor of building No. 1 (hospital building with a catering unit) of the municipal non-profit enterprise "Kostopil Multidisciplinary Hospital of Intensive Care" of the Kostopil City Council at the address: 52A Stepanska St., Kostopil, Rivne District, Rivne Region. The proposed solution provides for the reconstruction of the reception department and the department of anesthesiology and intensive care, in accordance with the agreed general plan and the layout of technological equipment. It is envisaged: partial redevelopment of the premises of the departments in accordance with the agreed scheme to create better conditions for patients in the departments; reconstruction, without changing the main parameters of the building, of the existing entrance to the medical building for quick and unhindered transportation of patients by ambulances, and the arrangement of a ramp for the needs of low-mobility population groups; restoration of existing entrances to the departments to be reconstructed. Electricity supply - from the electrical panel building of building No. 1 after the metering unit. The power reserve is 60.0 kW. A new power network of the departments and a new lighting system of the premises to be reconstructed are planned. It is planned to install a system for calling medical personnel to patients (call buttons in the wards).Water supply (hot and cold water) - from the water supply network of the institution. It is planned to connect the designed sanitary appliances to the designed electric boilers, replace existing risers in the volume of the premises to be reconstructed. Additionally, it is planned to replace existing plumbing networks in the volume of basements under the designed departments. Drainage - discharge into the existing gravity sewer network of building No. 1. It is planned to connect to the existing risers in the designed department and replace the sewer risers within the premises to be repaired. Additionally, it is planned to replace the existing plumbing networks in the volume of the basements under the designed departments. Heat supply - it is planned to replace the heat supply system in the volume of the first floor. An air conditioning system is planned for the designed departments. The ventilation system is planned to be supply and exhaust using existing channels in the department premises. External fire extinguishing is planned from existing fire hydrants located on the territory of the institution. Landscaping and landscaping are planned. Construction duration - 8 months
Project cost24'893'594 UAH
Implementation period12 months