Kostopilska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
All streams
1
Projects
Projects by sectors
1
Projects
Projects by goal
1
Projects
Projects by status
17,71 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status

Current set filters (Filtered result: 1)

Project code: 091025-A6D5032E
Initiation date
Budget
Status
Local level of SP
Date10. 2025
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

Major renovation of the hospital's neurological department

Project Goal
Increasing compliance with modern standards. Improving the condition of infrastructure, Ensuring inclusiveness and equal opportunities, Improving the quality of services
Geography
Kostopil city
Initiator
MUNICIPAL NON-COMMERCIAL ENTERPRISE "KOSTOPOL MULTIPROFILE HOSPITAL OF INTENSIVE TREATMENT" OF KOSTOPOL CITY COUNCIL
Major renovation of the neurological department
Current renovation of the neurological department
A major overhaul of the neurological department, located on the 1st floor of building No. 1 (hospital building with a catering unit) of the municipal non-profit enterprise "Kostopil Multidisciplinary Hospital for Intensive Care" of the Kostopil City Council in accordance with the provided defect acts, is planned. It is planned: partial redevelopment of the department premises in accordance with the agreed scheme to create better conditions for patients in the department; adaptation of the existing entrance to the medical building and the neurological department for the needs of low-mobility population groups; installation of a system for calling medical personnel to patients (call buttons in the wards); It is necessary to: close the existing network of underground channels in the department premises with the installation of necessary inspection hatches for servicing the networks in them; a new power network of the department and a new lighting system for the premises; provide water supply (hot and cold water) from the institution's water supply network. It is planned: connection of designed sanitary appliances to existing risers in the designed department; replacement of sewer risers within the premises to be repaired; partial replacement of the heating system in accordance with the provided defect certificate; supply and exhaust ventilation system using existing ducts in the department's premises.
Project cost7'719'594 UAH
Implementation period5 months

In focus

All news