Reconstruction of the existing building of the catering unit and laundry into an educational building, with the placement of educational, sanitary and auxiliary premises of the 2nd, 3rd, 4th grade primary school in the building. Placement of a dual-purpose shelter in the basement of the building. Redevelopment of existing premises and changing the sizes of window and door openings. Taking into account the needs of low-mobility groups of the population according to DBN V.2.2-40:2018. Planning and decoration according to standards. Replacement of translucent enclosing structures and external doors according to DBN V. 2.6-31:2021. Heating, ventilation, water supply and sewage (according to standards). New electric lighting and power electrical equipment system. Communication and alarm system (telephone, internet). Fire alarm system, lightning protection if necessary (according to calculation). Execution of estimate documentation.
Project cost16'500'000 UAH
Implementation period12 months