Myrhorodska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
All streams
1
Projects
Projects by sectors
1
Projects
Projects by goal
1
Projects
Projects by status
30,77 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status

Current set filters (Filtered result: 1)

Project code: 050326-4E19C651
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date03. 2026
SectorMunicipal infrastructure and services
SubsectorDistrict Heating
StatusInvestment Feasibility Study

Reconstruction of the boiler house by installing a 160 kW cogeneration gas plant for the production of heat and electricity at the address: 17-A Starosvitska Street in Myrhorod, Poltava Region

Project goal
Introducing innovations and energy-efficient solutions. Contribution to climate or environmental goals, Increasing compliance with modern standards, Increasing compliance with modern standards, Improving the quality of services
Geography
Myrhorod city
Initiator
DEPARTMENT OF COMMUNAL RESOURCES OF MYRHOROD CITY COUNCIL
Maturity level
88
Reconstruction of the boiler house by installing a 160 kW cogeneration gas plant for the production of heat and electricity at the address: 17-A Starosvitska Street in Myrhorod, Poltava Region
Installation of high-efficiency gas boilers
Reconstruction of the boiler house with the installation of a 160 kW cogeneration gas plant is an economically and technically feasible solution for increasing the efficiency of the heat supply system. A cogeneration gas plant (CGU) is an energy system that simultaneously produces electricity and heat from natural gas or biogas. This principle of operation is called cogeneration. The project provides simultaneous production of electricity and heat with a high efficiency, which allows to significantly reduce energy costs, increase the energy independence of the facility and ensure stable operation in conditions of unstable energy supply. Additional advantages are the rational use of the existing boiler house infrastructure, reduction of energy losses, reduction of emissions and a relatively short payback period for investments. Therefore, the implementation of a CGU is an effective tool for modernizing the boiler house and increasing its reliability, efficiency and autonomy in modern conditions of Ukraine.
Budget30'779'362,01 UAH
Implementation period9 months

In focus