Reconstruction of the built-in premises of the dental laboratory building and the children's department (without changing the external geometric dimensions of their foundations in the plan) into the rehabilitation department of the KNP "Khorol City Hospital" at the address: Mykhayla Polonskyi St., 11/1b in the city of Khorol Reconstruction of the built-in premises of the dental laboratory building and the children's department (without changing the external geometric dimensions of their foundations in the plan) into the rehabilitation department of the KNP "Khorol City Hospital" at the address: Mykhayla Polonskyi St., 11/1b in the city of Khorol
The project involves the reconstruction of the building's built-in premises with the replacement of 28 windows with metal-plastic ones, and the reconstruction of the entrance group, the installation of 48 doors, the replacement of the water supply and sewage system, and the implementation of all plumbing works. A supply-exhaust countercurrent ventilation system is planned in the wards of the rehabilitation department. A lighting network is planned. All fire prevention measures will be taken, noise protection measures will be carried out, and energy saving measures will be implemented.
Project cost13'081'383 UAH
Implementation period8 months