The purpose of the project is to reconstruct the reception department of the KNMP "Kremenchuk Intensive Care Hospital" in order to create a modern emergency department that will meet the requirements of current state building codes, modern standards for organizing medical care and the unified standard for the design of emergency departments of Ukraine. The implementation of the project is aimed at improving the quality and speed of providing medical care to patients in emergency conditions, improving the working conditions of medical personnel, as well as increasing the energy efficiency of the building. To achieve the set goal, within the framework of the implementation of the public investment project, a set of organizational, construction and engineering measures is envisaged. In particular, it is planned to reconstruct the existing premises of the first floor of the hospital building with redevelopment and creation of functional areas in accordance with modern requirements for reception departments. It is also planned to build a special box for receiving emergency medical vehicles, which will ensure quick and safe transportation of patients to the department. The project provides for the arrangement of the necessary medical and auxiliary premises, in particular, a registration office, a patient triage room, examination rooms, an anti-shock ward, an operating room with a preoperative and sterilization room, a sanitary inspection room, diagnostic rooms (X-ray, tomography, ultrasound diagnostics, FGDS), as well as office premises for medical personnel. In addition, it is planned to introduce modern engineering systems: centralized supply of medical gases (oxygen), ventilation and air conditioning systems, new heating systems, power supply, internal engineering networks, fire alarm systems and modern plumbing equipment. Particular attention is paid to ensuring accessibility for low-mobility groups of the population.
Project cost14'801'100 UAH
Implementation period24 months