Kremenchutska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
All streams
1
Projects
Projects by sectors
1
Projects
Projects by goal
1
Projects
Projects by status
14,86 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status

Current set filters (Filtered result: 1)

Project code: 110326-1BF62767
Initiation date
Budget
Status
Local level of SP
Date03. 2026
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

Reconstruction of the reception department of the building of the KNMP "Kremenchuk Intensive Care Hospital" at Pavlova Street, 2 in the city of Kremenchuk, Poltava region. Adjustments

Project Goal
Creation of new facilities and services. Increasing compliance with modern standards, Increasing compliance with modern standards, Improving the equality of wealth distribution, Ensuring inclusiveness and equal opportunities, Introducing innovations and energy-efficient solutions, Improving the quality of services, Meeting demand
Geography
Poltavska region
Initiator
PUBLIC NON-COMMERCIAL MEDICAL ENTERPRISE "KREMENCHUTSKA INTENSIVE TREATMENT HOSPITAL"
Reconstruction of the reception building
Construction of a new reception building
The purpose of the project is to reconstruct the reception department of the KNMP "Kremenchuk Intensive Care Hospital" in order to create a modern emergency department that will meet the requirements of current state building codes, modern standards for organizing medical care and the unified standard for the design of emergency departments of Ukraine. The implementation of the project is aimed at improving the quality and speed of providing medical care to patients in emergency conditions, improving the working conditions of medical personnel, as well as increasing the energy efficiency of the building. To achieve the set goal, within the framework of the implementation of the public investment project, a set of organizational, construction and engineering measures is envisaged. In particular, it is planned to reconstruct the existing premises of the first floor of the hospital building with redevelopment and creation of functional areas in accordance with modern requirements for reception departments. It is also planned to build a special box for receiving emergency medical vehicles, which will ensure quick and safe transportation of patients to the department. The project provides for the arrangement of the necessary medical and auxiliary premises, in particular, a registration office, a patient triage room, examination rooms, an anti-shock ward, an operating room with a preoperative and sterilization room, a sanitary inspection room, diagnostic rooms (X-ray, tomography, ultrasound diagnostics, FGDS), as well as office premises for medical personnel. In addition, it is planned to introduce modern engineering systems: centralized supply of medical gases (oxygen), ventilation and air conditioning systems, new heating systems, power supply, internal engineering networks, fire alarm systems and modern plumbing equipment. Particular attention is paid to ensuring accessibility for low-mobility groups of the population.
Project cost14'801'100 UAH
Implementation period24 months

In focus

All news