Chornomorska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
1
Projects
Projects by sectors
1
Projects
Projects by goal
1
Projects
Projects by status
72,19 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status

Current set filters (Filtered result: 1)

Project code: 221225-A41181A7
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date12. 2025
SectorMunicipal infrastructure and services
SubsectorDistrict Heating
StatusPreliminary Investment Feasibility Study

Construction of a building with an upgrade of a gas-piston cogeneration unit (reserve power source) with a capacity of more than 1 MW on the territory of the boiler house of the Chornomorskteploenergo utility company of the Black Sea City Council of the Odesa district of the Odesa region at the address: Odesa region, Odesa district, Chornomorsk city, str. Sadova, 1

Project goal
Поява нових виробничих потужностей. Capacity building
Geography
Odeska region
Initiator
DEPARTMENT OF CAPITAL CONSTRUCTION OF THE BLACK SEA CITY COUNCIL OF ODESSA DISTRICT OF ODESSA REGION
Construction of a building with the installation of a gas-piston cogeneration plant
Alternative solution
Gas piston cogeneration plant (backup power source), based on the operation of two Jenbacher JMS 312 GS-N.L cogeneration gas piston plants with an electric capacity of 638 kW and a thermal capacity of 377 kW each. The plant is designed to meet the needs of the central gas generator plant "Chornomorskteploenergo" and operates in cogeneration mode: the generation of electrical energy occurs together with the generation of thermal energy, which, performing the function of cooling the gas piston engine, is simultaneously directed to heating the coolant in the heating network. The system under consideration is designed for two operating modes: - the so-called "island" mode, when the plant operates separately from the heating network, generating electricity only for the needs of the gas generator; - parallel operation mode with the electrical network. In this mode, the power plant mainly works to meet the gas generator's own needs, and peak surges in electricity consumption of the gas generator (starting currents) are compensated by the external power grid. This mode allows for more uniform operation of the power generating equipment, which ensures its uniform wear. The total heat load in the gas generator is 1434 kW, an additionally installed economizer increases the total heat output to 717 kW for each unit; Fuel type - natural gas.
Budget72'193'907 UAH
Implementation period10 months