Chornomorska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
1
Projects
Projects by sectors
1
Projects
Projects by goal
1
Projects
Projects by status
8,09 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status

Current set filters (Filtered result: 1)

Project code: 130326-96D9CD0C
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date03. 2026
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

Reconstruction of the pressure sewer collector at the address: Odesa region, Odessa district, Chornomorsk city, from Kosmonavtiv st., 59g in the village of Malodolynske to Svitla st., 51 in the village of Oleksandrivka

Project Goal
Improving the condition of infrastructure. Increasing compliance with modern standards, Improving the quality of services
Geography
Oleksandrivka town, Malodolynske village
Initiator
MUNICIPAL ENTERPRISE "CHORNOMORSKVODOKANAL" OF THE BLACK SEA CITY COUNCIL OF ODESSA DISTRICT OF ODESSA REGION
Reconstruction of the pressure sewer collector with replacement of the pipeline with PE100 polyethylene pipes
Major overhaul of the existing pressure sewer collector
The selected technical solution involves the reconstruction of the emergency section of the pressure sewer collector with the replacement of the existing worn-out pipeline with modern PE100 polyethylene pipes with a diameter of 250 mm. The total length of the reconstruction section is 464 m. The project involves the dismantling or decommissioning of the existing pipeline, the laying of a new pipeline using modern materials and technologies, the reconstruction of sewer wells, as well as the restoration of the road surface and landscaping after the completion of construction work. The use of polyethylene pipes will ensure high corrosion resistance, tightness of connections and long-term operation of the pipeline. The implementation of the solution will increase the reliability of the drainage system, reduce the risk of emergency situations and ensure stable transportation of wastewater to the sewage treatment plants of the city of Chornomorsk.
Project cost7'935'915 UAH
Implementation period3 months