Chornomorska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
All streams
1
Projects
Projects by sectors
1
Projects
Projects by goal
1
Projects
Projects by status
5,63 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status

Current set filters (Filtered result: 1)

Project code: 260326-38CA3BE3
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date03. 2026
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

Major repairs of damaged sections of household gravity sewer collectors passing through the territory of the main sewage pumping station at the address: Odesa region, Odessa district, Chornomorsk city, 23 Parkova st.

Project Goal
Improving the condition of infrastructure. Increasing compliance with modern standards
Geography
Chornomorsk city
Initiator
MUNICIPAL ENTERPRISE "CHORNOMORSKVODOKANAL" OF THE BLACK SEA CITY COUNCIL OF ODESSA DISTRICT OF ODESSA REGION
Major repairs of damaged sections of household gravity sewer collectors passing through the territory of the main sewage pumping station at the address: Odesa region, Odessa district, Chornomorsk city, 23 Parkova st.
Construction of new sections of household gravity sewer collectors passing through the territory of the main sewage pumping station at the address: Odesa region, Odessa district, Chornomorsk city, 23 Parkova st.
According to the design task, the working project provides for the overhaul of emergency sections of the existing sewer collector DN 800 mm on the territory of the State Water and Sewerage Service, with a total length of 126.2 m, which is designed along the existing route using the "rehabilitation" method - with the passage of polyethylene spiral-wound pipes SPIROKOR 600/678 Sn 8 inside the existing reinforced concrete pipe DN 800 mm. The destroyed walls of existing wells are restored with "Gidrozit" mixtures. After the completion of the repair work, the pits are backfilled.
Project cost4'638'495 UAH
Implementation period4 months