P61 – Phase 1: Construction of the TEC1 RCD Ø800 mm water main Velyky Dalnyk – PK130 (12.2 km)
Construction of a Ø800 mm water main made of cast iron pipes
The project involves the construction of a new section of the main water pipeline Ø800 mm from the connection point «Veliky Dalnyk» to PK130 with a total length of 12.2 km as part of the implementation of P61 – Phase 1. The new pipeline will be made of modern high-density polyethylene pipes HDPE TEC1 RCD, which are characterized by high corrosion resistance, long service life and low hydraulic losses. The construction of the water pipeline will allow creating a backup main branch of the centralized water supply system of the Chornomorsk urban territorial community, which will ensure increased reliability of drinking water transportation, stability of pressure in the system and reduction of the risk of emergency water supply shutdowns. The implementation of the project will contribute to increasing the resilience of critical water supply infrastructure and provide a more reliable water supply for the population of the community.
Project cost359'318'399 UAH
Implementation period27 months