Bilhorod-Dnistrovska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
1
Projects
Projects by sectors
1
Projects
Projects by goal
1
Projects
Projects by status
8,41 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status
Stream

Current set filters (Filtered result: 1)

Project code: 200126-E97A7091
Initiation date
Budget
Status
State level of SP
Local level of SPP
Local level of SP
Date01. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Major repairs of the catering unit of Gymnasium No. 2 at the address: Odesa region, Bilhorod-Dnistrovskyi, Serhiy Faynblat St., 37. Correction

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards
Geography
Bilhorod-Dnistrovskyi city
Initiator
DEPARTMENT OF EDUCATION OF THE BILHOROD-DNISTROV CITY COUNCIL
Maturity level
86
Major repairs of the catering unit of Gymnasium No. 2 at the address: Odesa region, Bilhorod-Dnistrovskyi, Serhiy Faynblat St., 37. Correction
Major repairs of the catering unit of Gymnasium No. 2 at the address: Odesa region, Bilhorod-Dnistrovskyi, Serhiy Faynblat St., 37. Corrections (2)
In order to create and improve the proper conditions for organizing high-quality, safe and balanced nutrition in educational institutions, implement effective models and improve food safety conditions, restore and modernize the catering unit using the latest technological processes, improve energy efficiency indicators and comply with the principles of the Hazard Analysis and Critical Control Point (HACCP) system optimization and reconstruction of the catering unit of Gymnasium No. 2 of the city of Bilhorod-Dnistrovskyi, Odessa region, 37 Serhiy Faynblat St. is provided. On the basis of the specified educational institution, the educational process of Gymnasium No. 6 of the city of Bilhorod-Dnistrovskyi, Odessa region is also carried out in the second shift in a full-time format, thanks to the equipped civil defense structure (shelter), equipped with a distribution line and a dining hall, where the process of feeding students of Gymnasium No. 2 and Gymnasium No. 6 is carried out.
Project cost8'216'986 UAH
Implementation period6 months

In focus

All news