18'668,41 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status
Stream
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date12. 2025
SectorHousing
SubsectorHousing Reconstruction
StatusPreliminary Investment Feasibility Study

Financing low-carbon infrastructure in cities - Eastern Partnership and Central Asia Programme (FELICITY II) in the territory of Mykolaiv urban territorial community

Project goal
Rebuilding the damaged/destroyed. Improving the condition of infrastructure
Geography
Mykolaivska community
Initiator
DEPARTMENT OF HOUSING AND UTILITIES OF MYKOLAIVSKY CITY COUNCIL
Financing low-carbon infrastructure in cities - Eastern Partnership and Central Asia Programme (FELICITY II) in the territory of Mykolaiv urban territorial community
Current repairs of apartment buildings damaged as a result of armed aggression
Within the framework of the International Climate Initiative (IKI) International Technical Assistance Project “Financing Low-Carbon Infrastructure in Cities – Eastern Partnership and Central Asia Programme (FELICITY II)”, funded by the Government of the Federal Republic of Germany through the Federal Ministry for Economic Affairs and Energy (BMWE), investments in low-carbon and climate-resilient urban infrastructure in the Eastern Partnership and Central Asia countries have increased significantly and contribute to the achievement of the mitigation and adaptation goals linked to the Nationally Determined Contribution (NDC) and aimed at achieving the Sustainable Development Goals (SDGs). The participating countries of the Project have the opportunity to implement low-carbon and climate-resilient infrastructure projects with the support of international climate finance. Up to ten (10) projects have been positively assessed by the European Investment Bank (EIB) for further financing under the Pilot Project for Energy Efficient Renovation of Partially Damaged Residential Buildings Project Objectives - Strengthening the institutional capacity of territorial communities in planning and implementing investment projects; - Carrying out technical, financial and economic assessments of priority projects; preparing project and estimate documentation (PKD) and tender documentation for the Recipient's further participation in the process of attracting financing from international financial institutions for the implementation of these projects. - Developing project and estimate documentation (PKD) in accordance with the requirements of Ukrainian legislation and international financial institutions, in particular the European Investment Bank (EIB); - Assistance in forming a project implementation group (PIG / «single window») for coordination, monitoring and reporting during investment implementation, as well as operation after the completion of the Project; - Conducting training and consultations for staff appointed by the Recipient on preparing project proposals, project and procurement management in accordance with EIB standards, as well as consulting residents in the process of energy-efficient building renovation; - Involving residents in decision-making on proposed energy efficiency measures and supporting the establishment of an ASMB (association of apartment building owners); - Improving the skills of service providers in the energy-efficient renovation of apartment buildings sector; - Developing a concept for integrating climate-smart approaches in reconstruction; - Collecting, systematizing and documenting best practices and lessons learned during the Project implementation; - Developing a common concept for scaling up the Project on energy-efficient renovation of partially damaged residential buildings.
Budget60'000'000 UAH
Implementation period36 months
Local level of SPP
Local level of SP
Date12. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Restoration of the Mykolaiv Lyceum No. 51 of the Mykolaiv City Council of the Mykolaiv region at the address: Mykolaiv, Parusny Lane, 3-a in the city of Mykolaiv

Project goal
Rebuilding the damaged/destroyed. Increasing compliance with modern standards, Increasing compliance with modern standards, Improving the equality of wealth distribution, Improving the condition of infrastructure, Ensuring inclusiveness and equal opportunities, Improving the quality of services, Meeting demand
Geography
Mykolaiv city
Initiator
DEPARTMENT OF CAPITAL CONSTRUCTION OF MYKOLAIVSKY CITY COUNCIL
Reconstruction of the Mykolaiv Lyceum No. 51 of the Mykolaiv City Council of the Mykolaiv region at the address: Mykolaiv, Parusnyi Lane, 3A in the city of Mykolaiv.
New construction of the Mykolaiv Lyceum No. 51 of the Mykolaiv City Council of the Mykolaiv region at the address: Mykolaiv, Parusnyi Lane, 3-a in the city of Mykolaiv
Reconstruction with partial replacement of engineering networks and modernization of individual premises without full restoration of the building of the Mykolaiv Lyceum No. 51 of the Mykolaiv City Council of the Mykolaiv region at the address: Mykolaiv, Parusnyi Lane, 3-a in the city of Mykolaiv
The project involves the restoration and reconstruction of Lyceum No. 51, which suffered significant damage during shelling. The goal is to provide safe, modern and energy-efficient learning conditions, in compliance with all current construction standards, energy efficiency, fire and technogenic safety, sanitary and anti-epidemic requirements.
Budget501'224'181 UAH
Implementation period26 months
Local level of SPP
Local level of SP
Date12. 2025
SectorTransport Sector
SubsectorRoad transport and road infrastructure
StatusInvestment Feasibility Study

Major repairs to the retaining wall along the road along Uzvoz Paromny

Project goal
Improving the condition of infrastructure. Increasing compliance with modern standards
Geography
Mykolaivska community
Initiator
ADMINISTRATION OF THE CENTRAL DISTRICT OF MYKOLAIV CITY COUNCIL
Overhaul
Construction
The major overhaul of the retaining wall is aimed at improving its technical characteristics, safety, durability and appearance using modern technologies and materials. The use of concrete blocks is envisaged to avoid emergency situations.
Budget5'404'000 UAH
Implementation period10 months
Local level of SPP
Local level of SP
Date12. 2025
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

Overhaul of elevators in inpatient medical facilities

Project goal
Increasing compliance with modern standards. Increasing compliance with modern standards
Geography
Mykolaivska region
Initiator
HEALTH DEPARTMENT OF MYKOLAIV CITY COUNCIL
elevator overhaul
no
elevator overhaul
Budget38'840'000 UAH
Implementation period12 months
Local level of SPP
Local level of SP
Date12. 2025
SectorTransport Sector
SubsectorRoad transport and road infrastructure
StatusInvestment Feasibility Study

Major repairs of the road surface on 9-a Slobidska Street from Pogranichna Street to Kovalska (Kuznetska) Street in Mykolaiv

Project goal
Improving the condition of infrastructure. Increasing compliance with modern standards
Geography
Mykolaiv city
Initiator
DEPARTMENT OF HOUSING AND UTILITIES OF MYKOLAIVSKY CITY COUNCIL
Major repairs of the road surface on 9-a Slobidska Street from Pogranichna Street to Kovalska (Kuznetska) Street in Mykolaiv
Current road surface repairs on 9-a Slobidska Street from Pohranychna Street to Kovalska (Kuznetska) Street in Mykolaiv
The project involves major repairs to the road surface on 9-a Slobidska Street in the section from Pohranychnaya Street to Kovalskaya (Kuznetskaya) Street in Mykolaiv. The work includes the restoration of the carriageway, strengthening of the road surface base, and improvement of the operational characteristics of the road in order to increase traffic safety and comfort for road users.
Budget11'114'326 UAH
Implementation period9 months
Local level of SPP
Local level of SP
Date12. 2025
SectorMunicipal infrastructure and services
SubsectorUrban planning and landscaping
StatusInvestment Feasibility Study

Major repairs of the sidewalk on Hliba Babicha Street (8 Bereznya) from Tsentralny Avenue to Poperechna Street 2 (even side) in Mykolaiv

Project goal
Improving the condition of infrastructure. Increasing compliance with modern standards
Geography
Mykolaiv city
Initiator
DEPARTMENT OF HOUSING AND UTILITIES OF MYKOLAIVSKY CITY COUNCIL
Major repairs of the sidewalk on Hliba Babicha Street (8 Bereznya) from Tsentralny Avenue to Poperechna Street 2 (even side) in Mykolaiv
Current sidewalk repairs on Hliba Babicha St. (8 Bereznya) from Tsentralny Ave. to Poperechna St. 2 (even side) in Mykolaiv EDIT IT
The project involves major repairs to the sidewalk on Hliba Babicha St. (8 Bereznya) from Tsentralny Ave. to Poperechna St. 2 (even side) in Mykolaiv. The work includes resurfacing, replacing the base, installing curbs, and ensuring safe and comfortable conditions for pedestrians. The project will contribute to improving the landscaping and increasing the level of accessibility of urban space.
Budget7'099'633 UAH
Implementation period9 months
Local level of SPP
Local level of SP
Date12. 2025
SectorMunicipal infrastructure and services
SubsectorUrban planning and landscaping
StatusInvestment Feasibility Study

Major repairs of the sidewalk with the installation of a bicycle path on Kurortna Street (even side) from Yevheniya Loginova (Krylova) Street to General Oleksa Almazova General Karpenko Street in the Zavodsky district of Mykolaiv

Project goal
Improving the condition of infrastructure. Improving the quality of services
Geography
Mykolaivska community
Initiator
DEPARTMENT OF HOUSING AND UTILITIES OF MYKOLAIVSKY CITY COUNCIL
Major repairs of the sidewalk with the installation of a bicycle path on Kurortna Street (even side) from Yevheniya Loginova (Krylova) Street to General Oleksa Almazova General Karpenko Street in the Zavodsky district of Mykolaiv
Current sidewalk repairs on Kurortna Street (even side) from Yevheniya Loginova (Krylova) Street to General Oleksy Almazov General Karpenko Street in the Zavodsky District of Mykolaiv
The project "Overhaul of the sidewalk with the installation of a bicycle path on Kurortna Street (even side) from Yevheniya Loginova (Krylova) Street to General Oleksy Almazov (General Karpenko) Street in the Zavodsky district of Mykolaiv" provides for a comprehensive renovation of the pedestrian infrastructure with the installation of a separate bicycle path. The project includes the restoration of the sidewalk surface, the installation of bicycle infrastructure, safety elements, and the provision of barrier-free access. The implementation of the project will contribute to increasing the safety and comfort of pedestrians and cyclists, the development of sustainable mobility, and the improvement of the urban environment.
Budget10'841'369 UAH
Implementation period9 months
Local level of SPP
Local level of SP
Date12. 2025
SectorMunicipal infrastructure and services
SubsectorUrban planning and landscaping
StatusInvestment Feasibility Study

Major repairs to the sports and playground improvement facility on Khersonske Shosse Street between residential buildings 30, 32, 38 in the Ingulsky district of Mykolaiv

Project goal
Improving the quality of services. Improving the condition of infrastructure
Geography
Mykolaiv city
Initiator
DEPARTMENT OF HOUSING AND UTILITIES OF MYKOLAIVSKY CITY COUNCIL
Major repairs to the sports and playground improvement facility on Khersonske Shosse Street between residential buildings 30, 32, 38 in the Ingulsky district of Mykolaiv
Current repairs to the sports and playground improvement facility on Khersonske Shosse Street between residential buildings 30, 32, 38 in the Ingulsky district of Mykolaiv
The project "Overhaul of the sports and playground improvement facility on Khersonske Shosse Street between residential buildings 30, 32, 38 in the Ingul district of Mykolaiv" provides for a comprehensive renovation of the territory in order to create a safe, modern and functional space for residents to play sports and relax. The project includes the restoration of the playground's surface, the installation and replacement of sports and gaming equipment, landscaping elements, as well as improving the safety and comfort of users. The implementation of the project will contribute to active leisure of the population, the development of physical culture and improving the quality of the urban environment.
Budget12'176'067 UAH
Implementation period9 months
Local level of SPP
Local level of SP
Date12. 2025
SectorMunicipal infrastructure and services
SubsectorUrban planning and landscaping
StatusInvestment Feasibility Study

Major repairs of the sidewalk on Artyleriiska Street from Marka Kropyvnytskyi Street to Velyka Morska Street (even side) in Mykolaiv

Project goal
Improving the condition of infrastructure. Improving the quality of services
Geography
Mykolaivska community
Initiator
DEPARTMENT OF HOUSING AND UTILITIES OF MYKOLAIVSKY CITY COUNCIL
Major repairs of the sidewalk on Artyleriiska Street from Marka Kropyvnytskyi Street to Velyka Morska Street (even side) in Mykolaiv
Current sidewalk repairs on Artyleriiska Street from Marka Kropyvnytskyi Street to Velyka Morska Street (even side) in Mykolaiv
The project "Overhaul of the sidewalk on Artyleriiska Street from Marka Kropyvnytskyi Street to Velyka Morska Street (even side)" in Mykolaiv provides for a comprehensive renovation of the pedestrian infrastructure on a total area of 1620 sq.m. The work includes dismantling worn-out pavements, installing new pavements, restoring the base, curbs, drainage, and ensuring barrier-free access. The project is aimed at increasing the safety and comfort of pedestrians, improving landscaping and transport and pedestrian accessibility in the central part of the city.
Budget3'400'002 UAH
Implementation period9 months
Local level of SPP
Local level of SP
Date12. 2025
SectorMunicipal infrastructure and services
SubsectorUrban planning and landscaping
StatusInvestment Feasibility Study

Major repairs with energy saving and energy efficiency measures for the building of preschool educational institution No. 87 at the address: Mykolaiv, Pryvilna St., 57. Corrections

Project goal
Increasing compliance with modern standards. Introducing innovations and energy-efficient solutions
Geography
Mykolaivska region
Initiator
DEPARTMENT OF CAPITAL CONSTRUCTION OF MYKOLAIVSKY CITY COUNCIL
Major repairs with energy saving and energy efficiency measures for the building of preschool educational institution No. 87 at the address: Mykolaiv, Pryvilna St., 57. Corrections
By installing barrier-free access facilities for people with disabilities and other low-mobility population groups
Installation of lifts and railings for MGN, installation of entrance doors and canopies for MGN; installation of a gate device, as a separate structure on the side of the main gate; installation of paving slabs of the FEM type
Budget1'628'500 UAH
Implementation period4 months

In focus

All news