Hnizdychivska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
3
Projects
Projects by sectors
3
Projects
Projects by goal
3
Projects
Projects by status
8,01 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date01. 2026
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

"Overhaul of the sewage pumping station and treatment facilities on the territory of the "Ploshchadka" residential area in the village of Hnizdychiv, Stryi district, Lviv region"

Project Goal
Improving the condition of infrastructure. Contribution to climate or environmental goals, Increasing compliance with modern standards, Improving the equality of wealth distribution, Improving the quality of services
Geography
Hnizdychivska community, Hnizdychiv town
Initiator
HNIZDYCHIV VILLAGE COUNCIL OF STRYYSK DISTRICT OF Lviv REGION
Maturity level
81
"Overhaul of the sewage pumping station and treatment facilities on the territory of the "Ploshchadka" residential area in the village of Hnizdychiv, Stryi district, Lviv region"
"Construction of a sewage pumping station and treatment facilities on the territory of the "Ploshchadka" residential area in the village of Hnizdychiv, Stryi district, Lviv region"
On the territory of the residential area «Ploschadka» In the village of Hnizdychiv, Hnizdychiv Village Council, Stryi district, Lviv region, there is a sewage network that was put into operation in 1949 and includes a sewage pumping system consisting of networks and treatment tanks, and a sewage collector. Over the decades of operation, the engineering structures have suffered significant wear and tear, which has led to numerous problems with drainage. Today, the sewage network, which serves 360 residents of the specified area for the collection of liquid sewage, is in an emergency state. The existing sewage pumping station (SPS) does not provide sewage pumping. The structures designed to pump out sewage are not working, and liquid sewage, due to clogged pipelines, is drained into septic tanks manually. Thus, the sewage system in the residential area needs urgent modernization, including major repairs and the introduction of the latest technologies and energy-efficient equipment. This is necessary to ensure reliable drainage from the homes of 360 people and prevent environmental pollution. The main goal of the repair of the sewage pumping station and treatment facilities is to improve the ecological state of the environment, increase the efficiency of wastewater treatment, ensure reliable and uninterrupted operation of the equipment, as well as reduce energy consumption, prevent the discharge of untreated water, protect the health of the population and water bodies from pollution. The PROJECT provides for:- replacement of the central heating system (capacity 25 cubic meters)- major repairs of treatment facilities- replacement of the route between the sewage treatment plant and treatment facilities with a length of 158 m.- installation of a biological treatment station- replacement of the power supply system Total project budget - UAH 2918,204 thousandPeriod of work - within 1 year
Project cost2'918'204 UAH
Implementation period14 months
Local level of SPP
Local level of SP
Date01. 2026
SectorCulture and information
SubsectorCultural Heritage and National Memory
StatusInvestment Feasibility Study

Landscaping of the territory with the installation of a memorial stele to the modern heroes on Hrushevskoho Street, Hnizdychiv village, Stryi district, Lviv region

Project Goal
Creation of new facilities and services. Reducing territorial or social gaps
Geography
Hnizdychivska community
Initiator
HNIZDYCHIV VILLAGE COUNCIL OF STRYYSK DISTRICT OF Lviv REGION
Maturity level
83
Landscaping of the territory with the installation of a memorial stele to the modern heroes on Hrushevskoho Street, Hnizdychiv village, Stryi district, Lviv region
Reconstruction of the existing memorial stele on Hrusheskoho Street, Hnizdychiv village, Stryi district, Lviv region
The project "Land improvement with the installation of a memorial stele to modern heroes on Grusheskoho Street, Hnizdychiv village, Stryi district, Lviv region" involves the installation of a stele (6 slabs) and the improvement of the surrounding area with the installation of paving stones (275 sq.m.), street lighting (10 units). Project cost: 2800 thousand UAH
Project cost2'965'000 UAH
Implementation period8 months
Local level of SPP
Local level of SP
Date01. 2026
SectorTransport Sector
SubsectorRoad transport and road infrastructure
StatusInvestment Feasibility Study

"Major repairs and arrangement of sidewalks on Hrushevsky Street, Hnizdychiv village, Stryi district, Lviv region"

Project Goal
Improving the condition of infrastructure. Improving the equality of wealth distribution
Geography
Hnizdychivska community
Initiator
HNIZDYCHIV VILLAGE COUNCIL OF STRYYSK DISTRICT OF Lviv REGION
Maturity level
83
"Major repairs and arrangement of sidewalks on Hrushevsky Street, Hnizdychiv village, Stryi district, Lviv region"
"Establishment of a pedestrian zone with gravel pavement along Hrushevsky Street, Hnizdychiv village, Stryi district, Lviv region"
The project involves the construction of sidewalks along Hrushevskoho Street in the village of Hnizdychiv with a length of 0.620 km: 1771 units of curbs (0.7 m each); 1116 sq.m. of paving stones; construction of the base. Project cost: 2000 thousand UAH
Project cost2'000'000 UAH
Implementation period5 months

In focus

All news