Project code: 161225-FCEA8BB0
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date12. 2025
SectorTransport Sector
SubsectorRoad transport and road infrastructure
StatusInvestment Feasibility Study

Reconstruction of the "Western Bypass" highway in the city of Sambor, Lviv region

Project Goal
Improving the condition of infrastructure. Increasing compliance with modern standards, Improving the equality of wealth distribution
Geography
Sambir city
Initiator
DEPARTMENT OF CAPITAL CONSTRUCTION AND HOUSING AND UTILITIES OF THE EXECUTIVE COMMITTEE OF SAMBIR CITY COUNCIL
Maturity level
92
Reconstruction of the "Western Bypass" highway in the city of Sambor, Lviv region
Current (pit) repairs without complete reconstruction
The project involves a comprehensive reconstruction of the road on the western outskirts of the city in order to create a modern, safe and efficient transport highway. The project includes: - Complete replacement of the road surface with the installation of an asphalt concrete road in accordance with regulatory standards.- Reconstruction of the base and improvement of the road surface design to ensure long-term operation.- Installation of a drainage system to prevent flooding and soil erosion.- Installation of road signs, markings and lighting to improve traffic safety.- Organization of dividing lanes, exits and arrangement of access for all population groups, including low-mobility categories. The implementation of this solution will allow increasing the road capacity to 800-1000 vehicles/hour per lane, reducing the load on the central streets of the city, increasing traffic safety and ensuring effective transit and local traffic flow. The project meets modern infrastructure standards and contributes to the sustainable development of the community.
Project cost103'000'000 UAH
Implementation period12 months