Zolochivska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
All streams
1
Projects
Projects by sectors
1
Projects
Projects by goal
1
Projects
Projects by status
11,75 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status

Current set filters (Filtered result: 1)

Project code: 211025-864505AD
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date10. 2025
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

"Overhaul of the water supply system from the water intake "Zolochiv" to Sichovyh Striltsiv Street in the city of Zolochiv, Zolochiv district, Lviv region"

Project goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Improving the condition of infrastructure
Geography
Zolochiv city
Initiator
Zolochiv City Council, Zolochiv District, Lviv Region
Repair of the water supply line from the water intake "Zolochiv" to Sichovykh Striltsiv Street in the town of Zolochiv, Zolochiv district, Lviv region
Modernization of the water supply system from the water intake "Zolochiv" to Sichovykh Striltsiv Street in the town of Zolochiv, Zolochiv district, Lviv region
The water intake "Zolochiv" is located in the southeastern part of the city of Zolochiv in the valley of a small stream of the left tributary of the Zolochivka River. Today, this water intake is represented by four wells, two of which are operational No. 9633/1 and No. 10822/3 with a depth of 70m and 80m, respectively. The wells exploit an aquifer complex in the Upper Cretaceous deposits. The Zolochiv City Council has allocated two land plots with an area of 2.32 hectares and 0.6966 hectares for the water intake site. The design capacity is 4.8 thousand m/day; equipped with deep pumps WILO 200/70, 55 kW, - 2 pcs. The length of the water supply networks of the city of Zolochiv - 78.3 km. Average service life 45 years. Depreciated - 46 km., dilapidated - 29.35 km., diameter from 20 mm to 200 mm., including the length of water mains - 4.3 km. Depreciated and dilapidated - 1.2 km.; diameter from 150 mm. to 400 mm.
Budget11'759'204 UAH
Implementation period14 months

In focus

All news