Boiarska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
1
Projects
Projects by sectors
1
Projects
Projects by goal
1
Projects
Projects by status
35 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status
Stream

Current set filters (Filtered result: 1)

Project code: 171025-A3C991AB
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date10. 2025
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

Reconstruction of the water supply from the 2nd lifting station to the 3rd lifting station at the address: Ukraine, Kyiv region, Fastiv district, Boyarsk urban territorial community

Project Goal
Introducing innovations and energy-efficient solutions. Improving the condition of infrastructure
Geography
Boiarska community
Initiator
BOYAR CITY COUNCIL
Maturity level
78
Reconstruction of the water supply from the 2nd lifting station to the 3rd lifting station at the address: Ukraine, Kyiv region, Fastiv district, Boyarsk urban territorial community
Using trenchless repair technologies, such as hydromechanical sleeving or threading new pipes into old ones without digging up the roadway.
The goal of the water pipeline reconstruction project is to ensure a reliable and stable water supply for the Boyarska community by replacing worn-out pipes and modernizing pumping equipment. To achieve this goal, the pipe sleeve method is used to intervene without large-scale destruction of the existing infrastructure, which allows avoiding accidents and reducing repair costs.
Project cost32'020'000 UAH
Implementation period24 months

In focus

All news