Date03. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

"Creation of an educational space within the framework of the "New Ukrainian School" reform of the Boguslavsk urban territorial community of the Kyiv region"

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Improving the quality of services
Geography
Bohuslav city
Initiator
EDUCATION DEPARTMENT OF BOGUSLAV CITY COUNCIL
Maturity level
83
Phased modernization of physics and chemistry classrooms
Complete overhaul of physics and chemistry classrooms
An alternative solution is the phased modernization of physics and chemistry classrooms, which allows for rapid improvement of learning and laboratory work conditions. The solution involves the ongoing renovation of the premises and the purchase of individual units of modern educational and laboratory equipment, which provides basic interactivity and comfort for students and teachers, and also creates a platform for the further complete arrangement of a modern educational space. However, such a solution will only partially improve learning conditions and will not ensure the creation of a modern educational space that combines theoretical learning with laboratory practice in accordance with the requirements of the "New Ukrainian School" reform.
Project cost1'572'333 UAH
Implementation period8 months
Design documentationAbsent
State level of SP
Local level of SPP
Local level of SP
Date10. 2025
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

Construction of a water tower in the Obukhiv district of the city of Boguslav, Kyiv region

Project Goal
Improving the condition of infrastructure. Increasing compliance with modern standards
Geography
Bohuslav city
Initiator
MUNICIPAL ENTERPRISE OF BOGUSLAV CITY COUNCIL "BOGUSLAV HOUSING AND COMMUNAL ENTERPRISE"
Maturity level
73
Construction of a pressure tower
Current repairs
The construction of a new tower remains a more strategic decision with a long-term effect.
Project cost3'500'000 UAH
Implementation period24 months
Design documentationAbsent
State level of SP
Local level of SPP
Local level of SP
Date10. 2025
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

Major repairs of the sewage treatment plant at 21 Ya. Shynkarenko St.

Project Goal
Increasing compliance with modern standards. Improving the quality of services
Geography
Bohuslav city
Initiator
MUNICIPAL ENTERPRISE OF BOGUSLAV CITY COUNCIL "BOGUSLAV HOUSING AND COMMUNAL ENTERPRISE"
Maturity level
86
Major repairs of the sewage treatment plant at the address: Boguslav, Ya. Shynkarenko St. 21
Current repair
The purpose of the project "Overhaul of Sewerage and Treatment Facilities" is to ensure reliable, safe and effective functioning of the centralized sewage system of the settlement by restoring and modernizing existing facilities that have exhausted their operational resource.
Project cost110'000'000 UAH
Implementation period27 months
Design documentationAbsent
Local level of SPP
Local level of SP
Date09. 2025
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

Reconstruction of the power grid system by installing a solar power plant at 21 Ya. Shynkarenka St.

Project Goal
Creation of new facilities and services. Increasing compliance with modern standards
Geography
Bohuslav city
Initiator
MUNICIPAL ENTERPRISE OF BOGUSLAV CITY COUNCIL "BOGUSLAV HOUSING AND COMMUNAL ENTERPRISE"
Maturity level
82
construction of a solar power plant
electrical network repair
The goal of the project is to ensure reliable, economical and environmentally safe energy supply by reconstructing the power grid system with the installation of a solar power plant, which will allow: to reduce electricity consumption costs; to increase the energy independence and security of the facility/community; to reduce greenhouse gas emissions and negative environmental impact; to create a modern infrastructure for sustainable development of the territory.
Project cost2'000'000 UAH
Implementation period17 months
Design documentationAbsent
State level of SP
Local level of SPP
Local level of SP
Date09. 2025
SectorMunicipal infrastructure and services
SubsectorDistrict Heating
StatusInvestment Feasibility Study

Reconstruction of the boiler room 0.31 Gcal/h (installation of two boilers) ISLAND 1A

Project Goal
Increasing compliance with modern standards. Improving the quality of services
Geography
Bohuslav city
Initiator
MUNICIPAL ENTERPRISE OF BOGUSLAV CITY COUNCIL "BOGUSLAV HOUSING AND COMMUNAL ENTERPRISE"
Maturity level
82
Reconstruction of the boiler room 0.31 Gcal/h (installation of two boilers) ISLAND 1A
current repairs
The implementation of the project has a significant economic, environmental and social effect, ensures the stability of heat supply and meets the strategic goals of sustainable development.
Project cost550'000 UAH
Implementation period15 months
Design documentationAbsent
Local level of SPP
Local level of SP
Date09. 2025
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusPreliminary Investment Feasibility Study

Major repairs and reconstruction of the water treatment plant at the address: Boguslav, Mysailivska Street 145

Project Goal
Increasing compliance with modern standards. Improving the quality of services
Geography
Bohuslav city
Initiator
MUNICIPAL ENTERPRISE OF BOGUSLAV CITY COUNCIL "BOGUSLAV HOUSING AND COMMUNAL ENTERPRISE"
Maturity level
93
reconstruction of the VOS station
Current repair
The reconstruction of the water treatment plant involves a set of measures aimed at restoring and modernizing buildings, structures and technological equipment to ensure stable and high-quality water supply. The project includes repairing and strengthening structures, replacing worn-out elements of engineering networks, updating pumping and filtration equipment, introducing modern disinfection technologies and automating processes. The implementation of the reconstruction will increase the efficiency of water purification in accordance with state standards, reduce operating costs, extend the service life of structures and guarantee the provision of high-quality drinking water to consumers.
Project cost40'500'000 UAH
Implementation period24 months
Design documentationAbsent
State level of SP
Local level of SPP
Local level of SP
Date09. 2025
SectorMunicipal infrastructure and services
SubsectorDistrict Heating
StatusInvestment Feasibility Study

Major overhaul of the chimney at the boiler house at 40 Polyova St., Boguslav.

Project Goal
Improving the condition of infrastructure. Improving the quality of services
Geography
Bohuslav city
Initiator
MUNICIPAL ENTERPRISE OF BOGUSLAV CITY COUNCIL "BOGUSLAV HOUSING AND COMMUNAL ENTERPRISE"
Maturity level
73
Current chimney repair
chimney reconstruction
Current repair of the boiler room chimney involves the performance of work to restore and maintain the operational condition of the structure, including partial restoration of brickwork, sealing of joints, elimination of cracks and damage, restoration of the protective coating and metal elements. The work is aimed at ensuring safe and uninterrupted operation of the pipe during the heating season of the building
Project cost180'000 UAH
Implementation period17 months
Design documentationAbsent
State level of SP
Local level of SPP
Local level of SP
Date09. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

School bus for students of the Boguslavsk urban territorial community

Project Goal
Ensuring inclusiveness and equal opportunities. Improving the equality of wealth distribution, Improving the quality of services, Reducing territorial or social gaps, Meeting demand
Geography
Bohuslavska community
Initiator
EDUCATION DEPARTMENT OF BOGUSLAV CITY COUNCIL
Maturity level
82
Purchase of new Ukrainian-made buses
Purchase of electric buses
Buses are affordable, have a service network in Ukraine. Supply of medium-capacity buses (25-30 seats) with diesel engines that meet Euro-6 environmental standards. Estimated service life - 10 years
Project cost8'100'000 UAH
Implementation period15 months
Design documentationAbsent
Local level of SPP
Local level of SP
Date09. 2025
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

Major repairs of basements of non-residential buildings of buildings No. 2R-5, 1R-3, R-2 with the installation of a protective civil defense structure (dual-purpose structure with the protective properties of an anti-radiation shelter) of the BMR "BOGUSLAVSKA TSL" at 27 Franka Ivana Street, Boguslav city, Obukhiv district, Kyiv region.

Project Goal
Increasing compliance with modern standards. Ensuring inclusiveness and equal opportunities
Geography
Bohuslav city
Initiator
PUBLIC NON-COMMERCIAL ENTERPRISE OF BOHUSLAV CITY COUNCIL "BOHUSLAV CENTRAL HOSPITAL"
Maturity level
74
Major repairs of basements of non-residential buildings of buildings No. 2R-5, 1R-3, R-2 with the installation of a protective civil defense structure (dual-purpose structure with the protective properties of an anti-radiation shelter) of the BMR "BOGUSLAVSKA TSL" at 27 Franka Ivana Street, Boguslav city, Obukhiv district, Kyiv region.
New construction of a dual-purpose structure with protective properties of an anti-radiation shelter at the KNP BMR "BOGUSLAVSKA TSL" at 27 Franka Ivana Street, Boguslav city, Obukhiv district, Kyiv region.
The project involves a comprehensive modernization of the protective structure in the KNP BMR "BOGUSLAVSKA TsL" at 27 Franka Ivana Street, Boguslav. The implementation is due to the unsatisfactory technical condition of the building's basements, water supply and sewage networks, and the need to create safe, energy-efficient, and modern conditions for the institution's patients and staff to stay in the protective structure during air raids.
Project cost101'500'000 UAH
Implementation period18 months
Design documentationAbsent
Local level of SPP
Local level of SP
Date09. 2025
SectorSocial sector
SubsectorVeterans
StatusInvestment Feasibility Study

Major renovation of the premises of the basement floor of the city club branch of the Basic Communal Club Institution "House of Culture" of the Boguslav City Council to provide barrier-free access for people with limited mobility to the gym of the adaptive club, at 2 Ostriv St. in the city of Boguslav, Obukhiv district, Kyiv region. Phase 1

Project Goal
Ensuring inclusiveness and equal opportunities. Creation of new facilities and services, Developing new territories or functions, Improving the condition of infrastructure, Creation of new jobs through project implementation
Geography
Kyivska region
Initiator
DEPARTMENT OF CULTURE, YOUTH AND SPORTS OF BOGUSLAV CITY COUNCIL
Maturity level
82
"Modernization of existing premises with minimal structural intervention and the use of mobile barrier-free equipment"
Creating barrier-free access for people with limited mobility.
The essence of the solution:Instead of a complete overhaul of the basement floor, it is proposed to leave the main structure of the building unchanged and provide barrier-free access to the gym by using:portable or modular ramps;compact vertical lifts for low-mobility groups;adaptive exercise machines that do not require reconstruction of the premises;mobile equipment for arranging temporary or variable access routes.Advantages:Saving materials and resources - less construction materials, less waste.Reducing environmental impact - minimal dust, noise and emissions during work.Quick implementation - installation takes less time than overhaul.Flexibility - equipment can be moved or modified depending on needs.Lower operating costs - reduced energy consumption and heating/cooling costs.:Disadvantages:Less durability – mobile equipment may require more frequent replacement or maintenance.Limited architectural changes – it is impossible to fully adapt the premises to all the needs of users with reduced mobility.Less aesthetic effect – the premises will not receive a completely renewed look.
Project cost2 UAH
Implementation period7 months
Design documentationAbsent