Bohuslavska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
11
Projects
Projects by sectors
11
Projects
Projects by goal
11
Projects
Projects by status
271,21 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Project cost
Status

Current set filters (Filtered result: 11)

Project code: 230426-861BDCFE
Initiation date
Project cost
Status
Local level of SP
Date04. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Modern educational space in the Supporting Educational Institution of Boguslav Academic Lyceum No. 1 of the Boguslav City Council of the Boguslav Territorial Community of the Kyiv Region

Project Goal
Improving the quality of services. Increasing compliance with modern standards, Increasing compliance with modern standards, Improving the condition of infrastructure, Meeting demand
Geography
Bohuslav city
Initiator
EDUCATION DEPARTMENT OF BOGUSLAV CITY COUNCIL
Phased modernization of physics and chemistry classrooms
Complete overhaul of physics and chemistry classrooms with the introduction of a modern STEM educational environment
1. An alternative solution is the phased modernization of physics and chemistry classrooms, which allows for rapid improvement of learning and laboratory work conditions. The solution involves the ongoing renovation of premises and the purchase of individual units of modern educational and laboratory equipment, which provides basic interactivity and comfort for students and teachers, and also creates a platform for further complete arrangement of a modern educational space. However, such a solution will only partially improve learning conditions and will not ensure the creation of a modern educational space that combines theoretical learning with laboratory practice in accordance with the requirements of the "New Ukrainian School" reform. An alternative solution is a partial renovation of the existing physics and chemistry classrooms through ongoing repairs and the purchase of individual pieces of equipment. Such a solution allows: to quickly and relatively economically improve learning conditions; to ensure the conduct of basic laboratory and practical classes; to begin a phased renovation of classrooms, which can become the basis for the further complete arrangement of a modern educational space; to provide an initial level of interactivity and a comfortable environment for students and teachers. Thus, the alternative solution is a realistic and affordable step to improve the educational environment, even if it does not reach the full potential of the comprehensive project. Duration of implementation: feasibility study - 3 months (preparatory work, needs assessment and repair planning), implementation - 3 months. 6 months (current renovation of premises and purchase of partial equipment).Achievement of target indicators:Partial improvement of learning conditions in physics and chemistry classrooms;Ensuring basic laboratory and practical classes;Access to updated space for 114 students and 2 teachers in the basic format (total number of students in the lyceum - 1109).Analysis of advantages and disadvantages:Advantages:Lower costs compared to full renovation;Quick implementation of the project;Partial renovation allows for gradual modernization of classrooms;Basic conditions for learning and safety are improved.Disadvantages:Full combination of theoretical and laboratory components is not ensured;Limited opportunities for the implementation of modern teaching methods and STEM projects.
Project cost3'302'720 UAH
Implementation period9 months
Design documentationAbsent

In focus

All news