1. Adjust the number of stumps to be uprooted according to the information on cut trees provided.2. Adjust the plan and list of land masses to reduce the volume of soil that must be removed from the construction area.3. Dismantle the existing fence with the neighboring cemetery site only in the planned areas of road traffic.
4. Provide for the main road of the cemetery, side roads and the area in front of the fire tank to be paved with paving stones that can withstand the passage of vehicles.5. Provide for the coverage of the area in front of entrance No. 2 to the new section of the cemetery and the access road from road concrete slabs.6. Provide the coverage of the cemetery sidewalks from figured paving elements.7. Provide road curbs formotorways and park curbs forsidewalks.8. Provide the cemetery territory fence from factory-made mesh panels on metal posts. Provide the wicket and gate at entrance No. 2 to the cemetery from purchased factory-made mesh panels.9. Provide lighting for the cemetery territory with autonomous spotlights with a power supply unit, charged by solar panels. Provide for the fastening of lighting elements on concrete poles.10. Provide an underground fire tank with a plastic capacity of 100 m3 with two openings.11. Provide a reinforced concrete monolithic foundation for the fire tank and elements for fastening the fire tank to the foundation.12. Provide for the planting of decorative bushes to decorate the earthen embankment above the fire tank.13. Adjust the section "External water supply" taking into account the replacement of the fire tank with a plastic one, adjust the lengths of the pipelines.14. Provide longitudinal sections of underground fire and water wells, review the products and materials used for their construction for accessibility and modernization.
Budget33'578'964 UAH
Implementation period14 months