Slavutytska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
All streams
37
Projects
Projects by sectors
37
Projects
Projects by goal
37
Projects
Projects by status
771,74 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date02. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Major repairs of the simplest shelter of the Slavutych Lyceum of the Slavutych City Council, Vyshhorod district, Kyiv region at the address: Slavutych, 6 Heroiv Dnipra St.

Project goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Improving the equality of wealth distribution, Improving the condition of infrastructure, Ensuring inclusiveness and equal opportunities, Improving the quality of services
Geography
Slavutych city
Initiator
DEPARTMENT OF EDUCATION AND SCIENCE OF THE SLAVUTYTSK CITY COUNCIL OF THE VYSHOROD DISTRICT, KYIV REGION
Major repairs of the simplest shelter of the Slavutych Lyceum of the Slavutych City Council, Vyshhorod district, Kyiv region at the address: Slavutych, 6 Heroiv Dnipra St.
Reconstruction of the Slavutych Lyceum building of the Slavutych City Council with the addition of a civil defense protective structure (dual-purpose structure with anti-radiation shelter properties) at the address: Slavutych, 6 Heroiv Dnipra St.
The proposed solution involves major repairs of the existing simplest shelter, which will comply with current state building codes and civil protection requirements. Main technical measures: Strengthening structures: waterproofing, strengthening walls and ceilings to ensure stability. Life support systems: arrangement of ventilation with air filtration, water supply and sewage. Safe entrances and exits: creation of a main and emergency evacuation exit. Power supply, backup power source, lighting and communication system. Functional arrangement: educational spaces, seating areas, sanitary facilities, areas for storing necessary materials.
Budget33'450'000 UAH
Implementation period9 months
Local level of SPP
Local level of SP
Date02. 2026
SectorMunicipal infrastructure and services
SubsectorDevelopment and Reconstruction of Subnational Infrastructure
StatusInvestment Feasibility Study

Construction of a new cemetery in Slavutych, Kyiv region

Project goal
Improving the condition of infrastructure.
Geography
Slavutych city
Initiator
DEPARTMENT OF INFRASTRUCTURE AND CAPITAL CONSTRUCTION OF THE SLAVUTYTSK CITY COUNCIL OF THE VYSHOROD DISTRICT OF THE KYIV REGION
Construction of a new cemetery in Slavutych, Kyiv region
Reconstruction of an existing cemetery in Slavutych, Kyiv region
1. Adjust the number of stumps to be uprooted according to the information on cut trees provided.2. Adjust the plan and list of land masses to reduce the volume of soil that must be removed from the construction area.3. Dismantle the existing fence with the neighboring cemetery site only in the planned areas of road traffic. 4. Provide for the main road of the cemetery, side roads and the area in front of the fire tank to be paved with paving stones that can withstand the passage of vehicles.5. Provide for the coverage of the area in front of entrance No. 2 to the new section of the cemetery and the access road from road concrete slabs.6. Provide the coverage of the cemetery sidewalks from figured paving elements.7. Provide road curbs formotorways and park curbs forsidewalks.8. Provide the cemetery territory fence from factory-made mesh panels on metal posts. Provide the wicket and gate at entrance No. 2 to the cemetery from purchased factory-made mesh panels.9. Provide lighting for the cemetery territory with autonomous spotlights with a power supply unit, charged by solar panels. Provide for the fastening of lighting elements on concrete poles.10. Provide an underground fire tank with a plastic capacity of 100 m3 with two openings.11. Provide a reinforced concrete monolithic foundation for the fire tank and elements for fastening the fire tank to the foundation.12. Provide for the planting of decorative bushes to decorate the earthen embankment above the fire tank.13. Adjust the section "External water supply" taking into account the replacement of the fire tank with a plastic one, adjust the lengths of the pipelines.14. Provide longitudinal sections of underground fire and water wells, review the products and materials used for their construction for accessibility and modernization.
Budget33'578'964 UAH
Implementation period14 months
Local level of SPP
Local level of SP
Date02. 2026
SectorMunicipal infrastructure and services
SubsectorUrban planning and landscaping
StatusInvestment Feasibility Study

Major repairs of the entrance group of the entrance No. 2 of the apartment building No. 1 of the Chernihiv quarter with the arrangement of a barrier-free environment for accessibility of low-mobility population groups at the address: Kyiv region, Vyshhorod district, Slavutych city, Chernihiv quarter, 1

Project goal
Ensuring inclusiveness and equal opportunities. Improving the condition of infrastructure
Geography
Slavutych city
Initiator
DEPARTMENT OF INFRASTRUCTURE AND CAPITAL CONSTRUCTION OF THE SLAVUTYTSK CITY COUNCIL OF THE VYSHOROD DISTRICT OF THE KYIV REGION
Major renovation of the entrance group of the entrance No. 2 of the apartment building No. 1 of the Chernihiv quarter with the arrangement of a barrier-free environment for accessibility for low-mobility groups at the address: Kyiv region, Vyshhorod district, Slavutych city, Chernihiv quarter, 1
Reconstruction of the entrance group of the entrance No. 2 of the apartment building No. 1 of the Chernihiv quarter with the arrangement of a barrier-free environment for accessibility for low-mobility groups at the address: Kyiv region, Vyshhorod district, Slavutych city, Chernihiv quarter, 1
List of construction and installation works that are planned to be performedby the design and estimate documentation:1. Dismantling works.2. Decoration of the entrance group (corridor, vestibule, porch).3. Installation of a ramp.4. Installation of a new entrance to the premises.5. Electrical works (lighting).6. Replacement of doors.7. Installation of an electric lift for the MGN.
Budget1'401'033 UAH
Implementation period3 months
Local level of SPP
Local level of SP
Date02. 2026
SectorMunicipal infrastructure and services
SubsectorDistrict Heating
StatusInvestment Feasibility Study

Reconstruction of the central city boiler house of the municipal enterprise "UZhKG" with the installation of a heat pump with a thermal capacity of 4 MW.

Project goal
Introducing innovations and energy-efficient solutions. Improving the quality of services
Geography
Slavutych city
Initiator
MUNICIPAL ENTERPRISE "HOUSEHOLD AND COMMUNAL SERVICES MANAGEMENT"
Reconstruction of the central city boiler house of the municipal enterprise "UZhKG" with the installation of a heat pump with a thermal capacity of 4 MW.
Reconstruction of the central city boiler house with the replacement of the KVGM-50-150 water heating gas boiler with two new water heating gas boilers with a total capacity of 32 MW located in the city of Slavutych
Reconstruction of the central city boiler house to replace two DEV-10/14 gas-fired water heating boilers with two new gas-fired water heating boilers with a total capacity of 10 MW, located in the city of Slavutych.
The project for the reconstruction of the central boiler house of the municipal enterprise "UZhKG" provides for the installation of a heat pump (air-water) with a thermal capacity of 4 MW on the territory of the boiler house. In the first quarter of 2026, it is planned to put into operation a solar station with a capacity of 1500 kW and an energy storage system with an energy reserve of 1290 kW•h on the territory of the central city boiler house. The hot water supply system was introduced in 1987 and is still in operation. For the operation of the city's hot water supply system in the summer, the central city boiler house and heat networks must ensure the supply of coolant with a temperature of 70°C to each city's central heating station. The actual average heat load of hot water supply, taking into account the fact that the equipment is operating in the summer, will be 4 MW. Since 2014, hot water supply service has not been provided in the inter-heating (summer) period, which leads to a decrease in the operational reliability of technological equipment and heating networks. The implementation of this project will primarily resolve the issue of providing hot water supply services in the city in the summer and increasing the operational reliability of the heat supply system and centralized hot water supply equipment in the city. Also, after implementation, the following problems will be solved:· Economic efficiency: In the summer, the heat pump provides thermal energy production with a much higher conversion coefficient (from 3 to 5 times), which is much cheaper than using gas boilers.· Refusal of the «summer» boiler mode: High-power gas boilers have low efficiency when operating at low load (only for DHW). The heat pump works efficiently, eliminating excess fuel consumption.· Environmental friendliness: Emissions of greenhouse gases and nitrogen oxides are significantly reduced, which is important for urban infrastructure.· Energy independence: Natural gas consumption is reduced, which increases the reliability of hot water supply in conditions of unstable supplies.· Automation: Modern heat pumps operate autonomously, do not require constant maintenance, and hybrid systems can automatically switch between energy sources. As a result of installing a heat pump with a thermal capacity of 4 MW, the following will be achieved: reduced consumption of natural gas for the production of thermal energy (due to the use of renewable energy sources), which is at least 14.0% of the annual consumption of the boiler house. 100% provision of centralized hot water supply services to all city consumers 8,560 subscribers (including the population - 8,543 subscribers, budget institutions - 5 subscribers and other consumers - 12 subscribers) in the summer period. Savings due to reduced costs for emergency repair work of all heat supply and hot water supply systems by increasing the operational reliability of technological equipment and heating networks.
Budget120'300'000 UAH
Implementation period24 months
Local level of SPP
Local level of SP
Date02. 2026
SectorMunicipal infrastructure and services
SubsectorUrban planning and landscaping
StatusInvestment Feasibility Study

Major renovation of the entrance group of the building of the Executive Committee of the Slavutych City Council with the arrangement of a barrier-free environment for accessibility for low-mobility groups at the address: Kyiv region, Vyshhorod district, Slavutych city, Central Square, 7

Project goal
Ensuring inclusiveness and equal opportunities. Improving the equality of wealth distribution, Improving the condition of infrastructure, Improving the quality of services
Geography
Slavutych city
Initiator
DEPARTMENT OF INFRASTRUCTURE AND CAPITAL CONSTRUCTION OF THE SLAVUTYTSK CITY COUNCIL OF THE VYSHOROD DISTRICT OF THE KYIV REGION
Major renovation of the entrance group of the building of the Executive Committee of the Slavutych City Council with the arrangement of a barrier-free environment for accessibility for low-mobility groups at the address: Kyiv region, Vyshhorod district, Slavutych city, Central Square, 7
Reconstruction of the entrance group of the building of the Executive Committee of the Slavutych City Council with the arrangement of a barrier-free environment for accessibility for low-mobility groups at the address: Kyiv region, Vyshhorod district, Slavutych city, Central Square, 7
Design solutions: Installation of regulatory stairs with double-sided handrails, contrasting marking of the first and last steps and tactile elements. Installation of ramps with a regulatory slope to ensure barrier-free access to the building. Replacing entrance doors with those that meet the requirements of the State Building Code: without thresholds or with minimal contrasting thresholds, of sufficient width and convenient to use. Installation of information and navigation signs, including using contrasting solutions and Braille. Installation of tactile indicators of the direction of movement and warning zones in accordance with the needs of people with visual impairments. Ensuring sufficient lighting of the stairs and the entrance area for safe use in the evening and at night. Implementation of a free navigation system: installation of information signs signs, building mnemonic diagrams, tactile elements and Braille inscriptions. Equipment of stairs with handrails on both sides, contrasting marking of steps. Equipment of internal ramps or lifts to overcome height differences of more than 0.2 m in compliance with regulatory slopes. Re-equipment of the administrator's desk on two levels. Ensuring accessibility of communication areas for all categories of users, including people in wheelchairs. Implementation of universal design principles: ease of use, safety, minimal physical effort and understandable perception of information regardless of sensory capabilities. Equipment of sanitary and hygienic premises accessible to a wide range of users, including disabled people. Equipment in public toilets (separately for men and women). Ensuring sufficient dimensions of the premises for access, turning and safe manipulations. Arranging places for breastfeeding and caring for infants. Using tactile indicators and clear navigation in accordance with the principles of universal design. Stairs: Installing handrails on both sides of the stairs. Contrasting marking of the first and last steps. Information and navigation signs, tactile elements, Braille. Location of control elements at the regulatory height (0.85-1.1 m). Ensuring safe and convenient use for all visitors. External elevator: Barrier-free access to all floors for disabled people, the elderly, parents with wheelchairs. Location without interference with load-bearing structures, entrance at ground level with sufficient space for maneuver. Cabin with sufficient dimensions for a wheelchair, buttons in an accessible area, tactile and contrasting markings, visual and audible information.
Budget6'015'001 UAH
Implementation period6 months
Local level of SPP
Local level of SP
Date02. 2026
SectorMunicipal infrastructure and services
SubsectorUrban planning and landscaping
StatusInvestment Feasibility Study

Major repairs to create a barrier-free environment for accessibility for low-mobility population groups of the building of the CENTER FOR COMPREHENSIVE REHABILITATION OF CHILDREN WITH DISABILITIES AND PERSONS WITH DISABILITIES "BLAGODAR" at the address: Slavutych, Chernihivskyi quarter, building 13

Project goal
Ensuring inclusiveness and equal opportunities. Increasing compliance with modern standards, Improving the equality of wealth distribution, Improving the condition of infrastructure, Improving the quality of services
Geography
Slavutych city
Initiator
DEPARTMENT OF INFRASTRUCTURE AND CAPITAL CONSTRUCTION OF THE SLAVUTYTSK CITY COUNCIL OF THE VYSHOROD DISTRICT OF THE KYIV REGION
Major repairs to create a barrier-free environment for accessibility for low-mobility population groups of the building of the CENTER FOR COMPREHENSIVE REHABILITATION OF CHILDREN WITH DISABILITIES AND PERSONS WITH DISABILITIES "BLAGODAR" at the address: Slavutych, Chernihivskyi quarter, building 13
Reconstruction of the building of the CENTER FOR COMPREHENSIVE REHABILITATION OF CHILDREN WITH DISABILITIES AND PERSONS WITH DISABILITIES "BLAGODAR" to provide a barrier-free environment for accessibility for low-mobility population groups at the address: Slavutych, Chernihivskyi quarter, building 13
The detailed design provides for the repair of the wheelchair room, new lighting, installation of fire detectors, alarm sensors. Dismantling the porch withreplacing it with a new porch. Repair of another existing porch for MNG. A tactile floor indicator has been designed, which is a strip of different materials of a certain color and corrugation. Premises decoration: Armstrong ceiling, plaster on the walls with subsequent painting, ceramic tiles, floor - ceramic tiles.
Budget4'878'349 UAH
Implementation period4 months
Local level of SPP
Local level of SP
Date02. 2026
SectorMunicipal infrastructure and services
SubsectorUrban planning and landscaping
StatusInvestment Feasibility Study

Major renovation of the entrance group of the Prombudbank building with the arrangement of a barrier-free environment for accessibility for low-mobility groups at the address: Kyiv region, Vyshgorod district, Slavutych city, 2a Heroiv Dnipra st.

Project goal
Ensuring inclusiveness and equal opportunities. Improving the equality of wealth distribution, Improving the condition of infrastructure
Geography
Slavutych city
Initiator
DEPARTMENT OF INFRASTRUCTURE AND CAPITAL CONSTRUCTION OF THE SLAVUTYTSK CITY COUNCIL OF THE VYSHOROD DISTRICT OF THE KYIV REGION
Major renovation of the entrance group of the Prombudbank building with the arrangement of a barrier-free environment for accessibility for low-mobility groups at the address: Kyiv region, Vyshgorod district, Slavutych city, 2a Heroiv Dnipra st.
Reconstruction of the entrance group of the Promstroibank building with the arrangement of a barrier-free environment for accessibility for low-mobility groups at the address: Kyiv region, Vyshgorod district, Slavutych city, 2a Heroiv Dnipra st.
In this working project, in order to ensure accessibility for low-mobility groups of the population, the following solutions are provided:- there is a lift for disabled people;- installation of handrails on the porch stairs;- external warning tactile strips (TC) are arranged in front of the stairs and the lift platform;- the beginning and end of the stairs are highlighted with contrasting markings;- a paved area is designed in front of the porch to arrange a parking space for disabled people;- unhindered and convenient movement inside the building is ensured due to the absence of height differences. Door thresholds on evacuation routes are absent, or should not exceed 15 mm. Thresholds should be highlighted with contrasting paint;- doors have been replaced in the vestibule, the width and design features of which meetthe requirements of DBN V.2.2-40;- the lower part of the door leaves is protected by a shock-proof strip at a height of at least300mm from the floor level on both sides. Doors must provide a delay in automatic closing of at least 5 seconds; - the doors are transparent, glazed with impact-resistant glass, the door leaves are made of white and contrastingly highlighted in green; - a lodgement with a tactile (full-color) Braille mnemonic scheme is installed in the lobby; - internal aluminum tactile indicators are arranged; - navigation and information signs are arranged at a height of 1.2-1.6 m; - existing doors inside the building are contrasting in accordance with the decoration of the premises; - the porch and elevator are illuminated; - devices for opening and closing doors are installed at a height of no more than 1.1 m and not less than 0.85 m from the floor; - the information system of zones and premises, as well as entrance nodes and traffic routes, provides continuity of information, timely orientation and unambiguous recognition of objects and places of visit.It is planned to place information with data on evacuation routes andwarning signs. Visual information should be placed on a contrasting background with the size of the signs corresponding to the viewing distance and associated with the artistic solution of the interior.
Budget1'046'321 UAH
Implementation period3 months
Local level of SPP
Local level of SP
Date02. 2026
SectorMunicipal infrastructure and services
SubsectorUrban planning and landscaping
StatusInvestment Feasibility Study

Major renovation of the building "International Business Development Center "Slavutych XXI Century" (Administrative Services Center) with the arrangement of a barrier-free environment for accessibility for low-mobility groups at the address: Kyiv region, Vyshhorod district, Slavutych, 2 Heroiv Dnipra st.

Project goal
Ensuring inclusiveness and equal opportunities. Improving the equality of wealth distribution, Improving the condition of infrastructure, Improving the quality of services
Geography
Slavutych city
Initiator
DEPARTMENT OF INFRASTRUCTURE AND CAPITAL CONSTRUCTION OF THE SLAVUTYTSK CITY COUNCIL OF THE VYSHOROD DISTRICT OF THE KYIV REGION
Major renovation of the building "International Business Development Center "Slavutych XXI Century" (Administrative Services Center) with the arrangement of a barrier-free environment for accessibility for low-mobility groups at the address: Kyiv region, Vyshhorod district, Slavutych, 2 Heroiv Dnipra st.
Reconstruction of the building "International Business Development Center "Slavutych XXI Century" (Administrative Services Center) with the arrangement of a barrier-free environment for accessibility for low-mobility groups at the address: Kyiv region, Vyshhorod district, Slavutych, 2 Heroiv Dnipra st.
The project provides for:- major repairs and arrangement of a toilet for MGN (according to DBN V.2.2-40:2018"Inclusivity of buildings and structures. Basic provisions" with Amendments No. 1,2);- replacement of doors to ensure unhindered access for persons with disabilities and other reduced mobility groups to the premises of the ASC;- installation of stainless steel railings on the stairs;- repair of the ramp plaster.
Budget531'224 UAH
Implementation period3 months
Local level of SPP
Local level of SP
Date02. 2026
SectorMunicipal infrastructure and services
SubsectorUrban planning and landscaping
StatusInvestment Feasibility Study

Major renovation of the second building of the Children's School of Arts with the arrangement of a barrier-free environment for accessibility for low-mobility groups at the address: Kyiv region, Vyshgorod district, Slavutych city, Nezalezhnosti avenue, 9

Project goal
Ensuring inclusiveness and equal opportunities. Improving the equality of wealth distribution, Improving the condition of infrastructure
Geography
Slavutych city
Initiator
DEPARTMENT OF INFRASTRUCTURE AND CAPITAL CONSTRUCTION OF THE SLAVUTYTSK CITY COUNCIL OF THE VYSHOROD DISTRICT OF THE KYIV REGION
Major renovation of the second building of the Children's School of Arts with the arrangement of a barrier-free environment for accessibility for low-mobility groups at the address: Kyiv region, Vyshgorod district, Slavutych city, Nezalezhnosti avenue, 9
Reconstruction of the second building of the Children's School of Arts with the arrangement of a barrier-free environment for accessibility for low-mobility groups at the address: Kyiv region, Vyshgorod district, Slavutych city, Nezalezhnosti avenue, 9
The project includes: installation of tactile internal and external navigation; installation of a lift on the porch and a lift in the hall on the first floor for access to the second floor of the building; installation of a universal toilet cabin for people with limited mobility and installation of a toilet with 3 cubicles for school students; installation of an entrance porch adapted for people with disabilities and people with limited mobility; replacement of doors; installation of paving slabs; repair and finishing works.
Budget4'099'772 UAH
Implementation period3 months
Local level of SPP
Local level of SP
Date02. 2026
SectorMunicipal infrastructure and services
SubsectorUrban planning and landscaping
StatusInvestment Feasibility Study

Major renovation of the entrance group of the building "Dnipro Department Store Building" with the arrangement of a barrier-free environment for accessibility for low-mobility groups at the address: Kyiv region, Vyshgorod district, Slavutych city, Nezalezhnosti avenue, 5

Project goal
Ensuring inclusiveness and equal opportunities. Improving the equality of wealth distribution, Improving the condition of infrastructure
Geography
Slavutych city
Initiator
DEPARTMENT OF INFRASTRUCTURE AND CAPITAL CONSTRUCTION OF THE SLAVUTYTSK CITY COUNCIL OF THE VYSHOROD DISTRICT OF THE KYIV REGION
Major renovation of the entrance group of the building "Dnipro Department Store Building" with the arrangement of a barrier-free environment for accessibility for low-mobility groups at the address: Kyiv region, Vyshgorod district, Slavutych city, Nezalezhnosti avenue, 5
Reconstruction of the entrance group of the building "Dnipro Department Store Building" with the arrangement of a barrier-free environment for accessibility for low-mobility groups at the address: Kyiv region, Vyshgorod district, Slavutych city, Nezalezhnosti avenue, 5
In this working project, in order to ensure accessibility for low-mobility groups of the population, the following solutions are provided:- the project provides for the arrangement of an entrance ramp adapted forpeople with disabilities and low-mobility groups of the population with two-level handrails;- the arrangement of handrails on the porch stairs;- external warning tactile strips (TC) are arranged in front of the stairs;- the beginning and end of the stairs and ramp are highlighted with contrasting markings;- unhindered and convenient movement inside the building is ensured due to theabsence of height differences. Door thresholds on evacuation routes are absent, or do not exceed15 mm. Thresholds must be highlighted with contrasting paint; - the lower part of the door leaves is protected by an anti-shock strip at a height of at least300 mm from the floor level on both sides. Doors must provide a delay in automatic closing of at least 5 seconds; - doors are transparent, glazed with impact-resistant glass, it is recommended to mark the doors in dark green on both sides; - internal aluminum tactile indicators are installed; - the porch and ramp are illuminated; - devices for opening and closing doors are installed at a height of no more than 1.1 m and not less than 0.85 m from the floor; - the information system of zones and premises, as well as entrance nodes and traffic routes, ensures continuity of information, timely orientation and unambiguous recognition of objects and places of visit. Visual information must be located on a contrasting background with the size of signs corresponding to the viewing distance and associated with the artistic solution interior.
Budget1'249'026 UAH
Implementation period3 months

In focus

All news