Slavutytska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
All streams
1
Projects
Projects by sectors
1
Projects
Projects by goal
1
Projects
Projects by status
6,25 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status

Current set filters (Filtered result: 1)

Project code: 240226-7EBD85BB
Initiation date
Budget
Status
Local level of SP
Date03. 2026
SectorEnergy Sector
SubsectorElectric power industry
StatusInvestment Feasibility Study

Increasing the resilience of the community's energy system by technically upgrading operational field teams with a modern mobile electrical laboratory in the city of Slavutych, Vyshhorod district, Kyiv region

Project Goal
Increasing compliance with modern standards. Improving the condition of infrastructure, Improving the quality of services
Geography
Slavutych city
Initiator
UTILITY ENTERPRISE "SLAVUTYCH-THERMOREZHI" OF THE SLAVUTYTSK CITY COUNCIL OF THE VYSHOROD DISTRICT, KYIV REGION
Acquisition of a comprehensive mobile cable electrical laboratory (KAELP-35 class or equivalent) based on a modern European chassis.
Purchase of a set of autonomous portable devices for diagnosing and testing cable lines.
The technical solution involves the acquisition of a modern electrical mobile laboratory (KAELP-35 class complex or equivalent) for the needs of the city's operational energy enterprise. This specialized diagnostic complex based on a European automobile chassis will allow operational field teams to independently and with high accuracy determine the location of damage to underground high-voltage cable lines (using acoustic and induction methods), conduct mandatory preventive equipment tests (up to 60 kV) and diagnose the condition of insulation (including modern cross-linked polyethylene cables). The introduction of its own mobile laboratory will eliminate the community's critical dependence on the services of third-party contractors during accidents, reduce the time for searching for breakdowns from several days to a few hours, and ensure reliable and safe operation of the energy infrastructure, guaranteeing stable power supply to residents and critical infrastructure facilities of Slavutych.
Project cost6'050'000 UAH
Implementation period4 months