Slavutytska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
All streams
1
Projects
Projects by sectors
1
Projects
Projects by goal
1
Projects
Projects by status
6,46 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status

Current set filters (Filtered result: 1)

Project code: 230226-16DC1DC3
Initiation date
Budget
Status
Local level of SP
Date03. 2026
SectorEnergy Sector
SubsectorElectric power industry
StatusInvestment Feasibility Study

Technical re-equipment of 10 kV electrical networks through the introduction of a remote monitoring and operational control system in the city of Slavutych, Vyshgorod district, Kyiv region

Project Goal
Increasing compliance with modern standards. Improving the condition of infrastructure, Improving the quality of services
Geography
Slavutych city
Initiator
UTILITY ENTERPRISE "SLAVUTYCH-THERMOREZHI" OF THE SLAVUTYTSK CITY COUNCIL OF THE VYSHOROD DISTRICT, KYIV REGION
Installation of a remote monitoring and control system for 10 kV electrical networks
Implementation of a simplified (budgetary) telemechanics and dispatching system based on domestically produced equipment with limited control functionality.
The project involves the implementation of a comprehensive automated supervisory control and data acquisition system (SCADA) for 10 kV electrical networks (based on city distribution points RP-1, RP-2, RP-4, RP-5). The technical solution consists in installing modern microprocessor controllers, master data acquisition terminals (RTU), multifunctional meters and industrial routers directly in high-voltage cells. Using protected communication channels, telemetric information (current level, voltage, switch positions, relay protection alarm signals) is transmitted in real time to the central server of the control point. Specialized licensed software forms a visual dynamic mnemonic diagram of the network, which allows the dispatcher to carry out round-the-clock monitoring and remotely (from a computer) control high-voltage equipment.
Project cost6'100'000 UAH
Implementation period6 months

In focus

All news