The project involves the installation of a hybrid solar power plant on the territory of the sewage treatment facilities of the Municipal Enterprise "Slavutych-Vodokanal" at the address: Kyiv region, Slavutych, Zaliznychnaya St. (construction site), 30. The hybrid system combines photovoltaic panels and battery systems with the ability to operate both in parallel mode with the power grid and in autonomous mode in case of emergency shutdowns. The planned solution allows partially replacing the electricity consumption of the treatment facilities with their own generation, reducing the load on external networks and providing backup power supply for critically important technological equipment. The complex consists of solar panels, inverters, energy storage systems, control controllers and equipment for integration with the existing infrastructure. The implementation of a hybrid solar power plant increases the energy efficiency of the facility, reduces greenhouse gas emissions, ensures uninterrupted operation of treatment facilities, and reduces the company's electricity costs in the long term.
Project cost29'544'409 UAH
Implementation period18 months