Current set filters (Filtered result: 1)

Project code: 100226-7D54B35A
Initiation date
Budget
Status
Local level of SP
Date02. 2026
SectorEnergy Sector
SubsectorElectric power industry
StatusInvestment Feasibility Study

Construction of a transformer substation for power supply to the residential area for participants in the Anti-Terrorist Operation/Joint Forces Operation in Slavutych, Vyshgorod District, Kyiv Region

Project Goal
Developing new territories or functions. Capacity building, Improving the equality of wealth distribution
Geography
Slavutych city
Initiator
UTILITY ENTERPRISE "SLAVUTYCH-THERMOREZHI" OF THE SLAVUTYTSK CITY COUNCIL OF THE VYSHOROD DISTRICT, KYIV REGION
Installation of a complete transformer substation (CTS) with two power transformers with a capacity of 630 kVA each (2x630 kVA)
Installation of a single-transformer complete substation with a capacity of 1250 kVA (KTP 1x1250 kVA)
The technical solution involves the installation of a modern two-transformer complete substation equipped with two power transformers with a capacity of 630 kVA each. This electrical complex includes high and low voltage switchgear, microprocessor relay protection systems, automation and commercial electricity metering. The main concept is to divide the total electrical load of consumers in the Dobryninsky district between two independent power sources that operate in mutual redundancy mode via an automatic or manual sectional switch. This allows for the power supply of apartment buildings and infrastructure facilities according to the second category of reliability.
Project cost6'200'000 UAH
Implementation period12 months