Major renovation of the building of the Club establishment "Cinema and Concert Complex" with the arrangement of a barrier-free environment for accessibility for low-mobility groups at the address: Kyiv region, Vyshgorod district, Slavutych city, Central Square, 9 Reconstruction of the building of the Club institution "Cinema and Concert Complex" with the arrangement of a barrier-free environment for accessibility for low-mobility groups at the address: Kyiv region, Vyshgorod district, Slavutych city, Central Square, 9
The project provides for:
installation of an external lift for lowering persons with disabilities into the PRU in pit No. 2 of the building;
installation of an internal lift for lifting persons with disabilities onto the stage in the assembly hall;
installation of external and internal ramps for barrier-free movement of persons with disabilities and other groups of people with reduced mobility in accordance with DBN V.2.2-40:2018 "Inclusivity of buildings and structures. Basic provisions" with amendments No. 1 and No. 2;
replacement of internal and external door blocks for barrier-free movement of persons with disabilities and other groups of people with reduced mobility in accordance with DBN V.2.2-40:2018 "Inclusivity of buildings and structures. Basic provisions" with amendments No. 1 and No. 2;
installation of a bathroom for persons with disabilities with disabilities and other low-mobility population groups according to DBN V.2.2-40:2018 "Inclusivity of buildings and structures. Basic provisions" with amendments No. 1 and No. 2;
arrangement of a children's playroom with the necessary equipment;
decoration of the premises in which the redevelopment will be carried out;- arrangement of a navigation system (including tactile) to improve the accessibility of the facility for all visitors;
replacement of chairs in the auditorium with decoration of the premises;
replacement of the existing covering of the terrace and the adjacent territory with a tile covering that meets the requirements of DBN p 5.1.7 DBN V.2.2-40:2018 "Inclusivity of buildings and structures. Basic provisions" with amendments made by Amendment No. 1 and Amendment No. 2).
Project cost17'562'384 UAH
Implementation period6 months