Slavutytska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
All streams
1
Projects
Projects by sectors
1
Projects
Projects by goal
1
Projects
Projects by status
Project code
Keyword
Budget
Status

Current set filters (Filtered result: 1)

Project code: 010426-A5D608E0
Initiation date
Budget
Status
Local level of SP
Date04. 2026
SectorMunicipal infrastructure and services
SubsectorDistrict Heating
StatusInvestment Feasibility Study

Purchase of a highly efficient water heating boiler with a capacity of 38 MW for the needs of the central city boiler house of the city of Slavutych

Project Goal
Improving the condition of infrastructure. Capacity building, Contribution to climate or environmental goals, Increasing compliance with modern standards, Increasing compliance with modern standards, Increasing the even distribution of resources, Introducing innovations and energy-efficient solutions, Поява нових виробничих потужностей, Improving the quality of services
Geography
Slavutych city
Initiator
SLAVUTYTSK CITY COUNCIL OF VYSHOROD DISTRICT, KYIV REGION
Purchase of a highly efficient water heating boiler with a capacity of 38 MW for the needs of the central city boiler house of the city of Slavutych
Purchase of a cogeneration unit based on gas piston or gas turbine engines
The project involves the purchase of a set of equipment with the following technical characteristics: Equipment type: Industrial hot water boiler. Manufacturer / Model: Viessmann / Vitomax D HW (or equivalent with similar technical parameters). Heat capacity (Q): 38 MW. Working pressure (P): 10 bar. Maximum coolant temperature (T): 125°C. Mandatory equipment: Waste gas economizer, designed for a working pressure P=10 bar.
Project cost101'082'817 UAH
Implementation period8 months

In focus

All news