Current set filters (Filtered result: 1)

Project code: 290326-A742A85A
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date03. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Major repairs to the entrance to the garage and the garage building on the territory of Buchansky Lyceum No. 5

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Improving the condition of infrastructure
Geography
Bucha city
Initiator
EDUCATION DEPARTMENT OF BUCHANAN CITY COUNCIL
Major repairs to the entrance to the garage and the garage building on the territory of Buchansky Lyceum No. 5
Current (partial) repair of the existing entrance and individual structural elements of the garage building without complete restoration of their technical characteristics.
The purpose of the project is to ensure safe, modern and proper conditions for the movement of transport and storage of school property on the territory of Buchanan Lyceum No. 5 by overhauling the entrance to the garage and the garage building. The implementation of the project will allow: To restore the technical condition of the road surface of the entrance and guarantee its safe use for the movement of school and technical transport. To improve the condition of the garage building, to ensure reliable storage of vehicles and school equipment. To reduce the risks of damage to vehicles and injuries while moving around the territory of the institution. To reduce the costs of current maintenance of the facility and extend its service life. The purpose of the project is directly aimed at increasing the safety and efficiency of the operation of the educational infrastructure of the institution, creating conditions for unhindered access of transport to the garage building and improving the overall functioning of the lyceum.
Project cost537'117 UAH
Implementation period8 months