Buchanska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
1
Projects
Projects by sectors
1
Projects
Projects by goal
1
Projects
Projects by status
2'193,60 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status
Sector

Current set filters (Filtered result: 1)

Project code: 101125-88F44624
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date11. 2025
SectorHousing
SubsectorHousing Reconstruction
StatusInvestment Feasibility Study

Housing Rehabilitation for Empowerment (HOPE)", Component 2: Design and Major Repair of Partially Damaged Apartment Buildings (BKB) in Buchanan Urban Territorial Community

Project goal
Rebuilding the damaged/destroyed. Improving the equality of wealth distribution, Improving the condition of infrastructure, Ensuring inclusiveness and equal opportunities
Geography
Buchanska community
Initiator
BUCHANA CITY COUNCIL
Housing Rehabilitation for Empowerment (HOPE)", Component 2: Design and Major Repair of Partially Damaged Apartment Buildings (BKB) in Buchanan Urban Territorial Community
Demolition of dilapidated buildings and new construction of low-rise residential buildings made of modern energy-efficient materials
Renovation according to the principle of “energy-efficient microdistrict” - comprehensive thermal modernization, installation of solar panels and local energy supply systems
The project is aimed at major repairs and restoration of partially damaged apartment buildings (AHU) within the Buchanan urban territorial community, which were damaged as a result of the armed aggression of the Russian Federation against Ukraine. The main measures include: repair of load-bearing structures, roofs, facades and internal engineering networks (heating, water supply, electricity supply, sewage); replacement or restoration of windows and doors using energy-saving materials; restoration of security systems, lighting and landscaping of adjacent areas; repair of common areas (stairwells, elevators, basements, technical rooms); ensuring a basic level of energy efficiency, in accordance with current state building standards (DBN V.2.6-31:2021). The project is implemented within the framework of the HOPE program with the support of international donors, the local budget and possible co-financing by residents. Its goal is to restore housing conditions for citizens as soon as possible, return property rights and create a safe living environment.
Budget2'193'606'589 UAH
Implementation period36 months

In focus

All news