A distinctive feature of this option is the use of a hybrid inverter, which will allow both to compensate for its own consumption of electrical energy and to accumulate excess generated electricity in batteries.The storage system can be selected in accordance with the specified load and backup time. According to the results of the engineering survey, the first floor distribution board, to which the ASC consumers, servers, etc. are connected, was determined as such a load. The estimated power of this board is 10 kW.This feasibility study considers the installation of a 40.8 kWh BOS-GM5.1*8 storage system, which consists of 8 battery blocks.The system under consideration was selected to provide 10 kW of uninterrupted power supply to the 1st floor distribution board for 4 hours.
Budget2'550'511,9 UAH
Implementation period8 months