Zaporizka

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
All streams
156
Projects
Projects by sectors
156
Projects
Projects by goal
156
Projects
Projects by status
22'333,30 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Initiator
Budget
Status
Initiation date
Budget
Status
Local level of SP
Date03. 2026
SectorPublic safety
SubsectorCivil defense
StatusInvestment Feasibility Study

Uninterrupted power supply of the video surveillance system of the city of Zaporizhia.

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Improving the condition of infrastructure, Introducing innovations and energy-efficient solutions
Geography
Zaporizhzhia city
Initiator
PUBLIC ENTERPRISE "CENTER OF MANAGEMENT OF INFORMATION TECHNOLOGIES"
Uninterrupted power supply of the video surveillance system in Zaporizhia
Power supply of 129 video surveillance nodes using existing infrastructure
Ensuring uninterrupted operation of 129 nodes of the sensor part of the city video surveillance system by installing backup and uninterruptible power supplies and organizing their maintenance.
Project cost20'514'000 UAH
Implementation period39 months
Local level of SP
Date02. 2026
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

Reconstruction of power supply systems using alternative energy sources (solar energy) at the facilities of the Municipal Enterprise "Vodokanal" of Zaporizhia (Phase I)

Project Goal
Introducing innovations and energy-efficient solutions. Increasing compliance with modern standards, Improving the condition of infrastructure, Поява нових виробничих потужностей
Geography
Zaporizhzhia city
Initiator
DEPARTMENT OF HOUSING AND UTILITIES MANAGEMENT OF ZAPORIZK CITY COUNCIL
Reconstruction of energy supply systems using alternative energy sources (solar energy) Phase I
Increasing backup power supply capacity by installing diesel generators
The project is aimed at increasing the energy efficiency and reliability of the water supply and wastewater systems of the city of Zaporizhzhia by installing distributed solar power plants and energy storage systems at 7 facilities of the municipal enterprise "Vodokanal".
Project cost98'093'051 UAH
Implementation period9 months
Local level of SP
Date02. 2026
SectorMunicipal infrastructure and services
SubsectorUrban planning and landscaping
StatusInvestment Feasibility Study

"Reconstruction of the automated commercial electricity metering system of the Zaporizhmisksvitlo utility company"

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Increasing the even distribution of resources, Improving the condition of infrastructure, Introducing innovations and energy-efficient solutions
Geography
Zaporizhzhia city
Initiator
MUNICIPAL ENTERPRISE ELECTRICAL NETWORK OF OUTDOOR LIGHTING "ZAPORIZHMISKSVITLO"
"Reconstruction of the automated commercial electricity metering system of the Zaporizhmisksvitlo utility company"
"Current repairs of the automated commercial electricity metering system of the Zaporizhmisksvitlo utility company"
Installation of an electricity metering unit at KTP-1 400 kVA with integration into the Automated Commercial Electricity Metering System.
Project cost162'387 UAH
Implementation period6 months
State level of SP
Local level of SPP
Local level of SP
Date01. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

New construction of the anti-radiation shelter of Zaporizhzhia Gymnasium No. 76 of the Zaporizhzhia City Council at the address: Zaporizhzhia, Sobornyi Ave., 154g

Project Goal
Creation of new facilities and services. Capacity building, Ensuring inclusiveness and equal opportunities, Introducing innovations and energy-efficient solutions, Reducing territorial or social gaps, Meeting demand
Geography
Zaporizka region
Initiator
DEPARTMENT OF EDUCATION AND SCIENCE OF ZAPORIZK CITY COUNCIL
Maturity level
80
New construction of the anti-radiation shelter of Zaporizhzhia Gymnasium No. 76 of the Zaporizhzhia City Council at the address: Zaporizhzhia, Sobornyi Ave., 154g
Major renovation of the basement for shelter
The project involves the construction of a new underground shelter with the properties of a PRU on the territory of a secondary education institution and is aimed at creating safe conditions for participants in the educational process by constructing an underground shelter in accordance with the requirements of current legislation on civil protection.
Project cost134'334'359 UAH
Implementation period7 months
State level of SP
Local level of SPP
Local level of SP
Date01. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

New construction of the anti-radiation shelter of Zaporizhzhia Gymnasium No. 4 of the Zaporizhzhia City Council at the address: Zaporizhzhia, Shevchenkivskyi district, Andriy Lobody st., 30

Project Goal
Creation of new facilities and services. Capacity building, Ensuring inclusiveness and equal opportunities, Introducing innovations and energy-efficient solutions, Reducing territorial or social gaps, Meeting demand
Geography
Zaporizka region
Initiator
DEPARTMENT OF EDUCATION AND SCIENCE OF ZAPORIZK CITY COUNCIL
Maturity level
77
New construction of the anti-radiation shelter of Zaporizhzhia Gymnasium No. 4 of the Zaporizhzhia City Council at the address: Zaporizhzhia, Shevchenkivskyi district, Andriy Lobody st., 30
Major renovation of the basement for shelter
The project involves the construction of a new underground shelter with the properties of a PRU on the territory of a secondary education institution and is aimed at creating safe conditions for participants in the educational process by constructing an underground shelter in accordance with the requirements of current legislation on civil protection.
Project cost135'431'202 UAH
Implementation period7 months
State level of SP
Local level of SPP
Local level of SP
Date01. 2026
SectorEducation and science
SubsectorProfessional education, specialized education
StatusInvestment Feasibility Study

Modernization of workshops and laboratories - creation of the Culinary HABU: implementation of the "Support Kitchen" model on the basis of the ZP(PT)O "Zaporizhzhia Professional College of Hotel and Restaurant Business"

Project Goal
Improving the quality of services. Increasing compliance with modern standards, Поява нових виробничих потужностей
Geography
Zaporizka region
Initiator
DEPARTMENT OF EDUCATION AND SCIENCE OF ZAPORIZK CITY COUNCIL
Maturity level
88
Modernization of workshops and laboratories - creation of the Culinary HABU: implementation of the "Support Kitchen" model on the basis of the ZP(PT)O "Zaporizhzhia Professional College of Hotel and Restaurant Business"
Construction of an educational building with a production component for training specialists in the hotel and restaurant sector
The project involves the modernization of workshops and laboratories of the vocational (vocational and technical) education institution "Zaporizhzhia Professional College of Hotel and Restaurant Business" and is aimed at creating a modern "Culinary Hub" (implementation of the "support kitchen" model)
Project cost35'000'000 UAH
Implementation period12 months
Local level of SPP
Local level of SP
Date01. 2026
SectorEducation and science
SubsectorProfessional education, specialized education
StatusInvestment Feasibility Study

Energy efficiency, safety and inclusiveness of the educational space based on the Zaporizhia Technological Vocational College "Motor Builder"

Project Goal
Ensuring inclusiveness and equal opportunities. Increasing compliance with modern standards, Introducing innovations and energy-efficient solutions
Geography
Zaporizka region
Initiator
DEPARTMENT OF EDUCATION AND SCIENCE OF ZAPORIZK CITY COUNCIL
Maturity level
88
Energy efficiency, safety and inclusiveness of the educational space based on the Zaporizhia Technological Vocational College "Motor Builder"
Dormitory construction
The energy efficiency and inclusiveness of the dormitory's educational space ensures energy savings through modern heating systems, creating an accessible and comfortable environment for everyone, including people with disabilities and low-mobility groups.
Project cost33'434'756 UAH
Implementation period8 months
Local level of SPP
Local level of SP
Date01. 2026
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

Reconstruction of the power supply for connecting the construction mechanisms of the clinical hospital with a basement, building A-6, the medical building, building E-7, of the KNP "MLE and SHMD" ZMR at 80 Peremohy St., Zaporizhzhia

Project Goal
Improving the condition of infrastructure. Increasing compliance with modern standards, Increasing compliance with modern standards, Ensuring inclusiveness and equal opportunities
Geography
Zaporizka community, Zaporizhzhia city
Initiator
PUBLIC NON-COMMERCIAL ENTERPRISE "CITY HOSPITAL OF EMERGENCY AND URGENT MEDICAL AID" OF ZAPORIZK CITY COUNCIL
Maturity level
83
Reconstruction of the power supply for connecting the construction mechanisms of the clinical hospital with a basement, building A-6, the medical building, building E-7, of the KNP "MLE and SHMD" ZMR at 80 Peremohy St., Zaporizhzhia
Power supply from autonomous diesel generators
The reconstruction solution involves the modernization and bringing into compliance with the current regulatory requirements of the power supply system to ensure reliable and uninterrupted power supply of the building mechanisms of the clinical hospital with a basement, building A-6, and the medical building, building E-7, of the KNP "MLE and SHMD" ZMR at 80 Peremohy St. in Zaporizhzhia. Within the framework of the implementation of the solution, it is planned to carry out a complex of works on the reconstruction of electrical network elements, the installation and connection of electrical equipment, cable lines and control systems in accordance with the approved design documentation. The implementation of the solution will provide the necessary technical parameters of the power supply, increase the level of reliability and safety of operation, and also create conditions for the timely and safe implementation of works on the reconstruction of the buildings of the healthcare institution.
Project cost12'268'376 UAH
Implementation period7 months
Local level of SPP
Local level of SP
Date01. 2026
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

Reconstruction of internal engineering networks of the Municipal Emergency and Rapid Medical Care Hospital (letter E-7) at 80 Peremohy St. in Zaporizhzhia

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Improving the condition of infrastructure, Improving the quality of services
Geography
Zaporizhzhia city
Initiator
PUBLIC NON-COMMERCIAL ENTERPRISE "CITY HOSPITAL OF EMERGENCY AND URGENT MEDICAL AID" OF ZAPORIZK CITY COUNCIL
Maturity level
83
Reconstruction of internal engineering networks of the Municipal Emergency and Rapid Medical Care Hospital (letter E-7) at 80 Peremohy St. in Zaporizhzhia
New construction of a separate cryocylinder building of an oxygen station with the arrangement of capital structures and a full set of engineering networks to provide the medical building of the building E-7 of the Municipal Emergency and First Aid Hospital 3MR at 80 Peremohy St. in Zaporizhzhia
The project plans to update and modernize medical gas supply systems, including centralized supply of gaseous medical oxygen, medical air, vacuum, nitrogen, carbon dioxide, as well as anesthetic gas removal systems (AGSS), control and signaling. It is planned to replace outdated pipelines and equipment with modern certified elements with an increased level of reliability and safety. The solution is implemented within the existing building without changing its functional purpose and planning decisions, in compliance with the requirements of labor protection, fire and technogenic safety. The proposed solution provides redundancy of vital systems, reduces the risks of emergency situations and creates conditions for the stable provision of high-quality emergency and medical care.
Project cost28'023'494 UAH
Implementation period7 months
State level of SP
Local level of SPP
Local level of SP
Date01. 2026
SectorEducation and science
SubsectorProfessional education, specialized education
StatusInvestment Feasibility Study

Modernization of workshops and laboratories - Center for Energy Professions on the basis of the Zaporizhia Technological Vocational College "Motor Builder"

Project Goal
Increasing compliance with modern standards. Creation of new jobs through project implementation, Meeting demand
Geography
Zaporizka region
Initiator
DEPARTMENT OF EDUCATION AND SCIENCE OF ZAPORIZK CITY COUNCIL
Maturity level
88
Modernization of workshops and laboratories - Center for Energy Professions on the basis of the Zaporizhia Technological Vocational College "Motor Builder"
Construction of workshops and laboratories
Creation of a modern training and practical center (TPC) on the basis of a vocational (vocational and technical) education institution to improve the quality of practical training of education seekers, develop professional competencies in accordance with the requirements of the modern labor market, and introduce innovative technologies into the educational process.
Project cost17'000'000 UAH
Implementation period10 months

In focus

All news