Project code
Keyword
Budget
Status

Current set filters (Filtered result: 1)

Project code: 160126-C1B1FF5B
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date01. 2026
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

Reconstruction of the power supply for connecting the construction mechanisms of the clinical hospital with a basement, building A-6, the medical building, building E-7, of the KNP "MLE and SHMD" ZMR at 80 Peremohy St., Zaporizhzhia

Project goal
Improving the condition of infrastructure. Increasing compliance with modern standards, Increasing compliance with modern standards, Ensuring inclusiveness and equal opportunities
Geography
Zaporizka community, Zaporizhzhia city
Initiator
PUBLIC NON-COMMERCIAL ENTERPRISE "CITY HOSPITAL OF EMERGENCY AND URGENT MEDICAL AID" OF ZAPORIZK CITY COUNCIL
Reconstruction of the power supply for connecting the construction mechanisms of the clinical hospital with a basement, building A-6, the medical building, building E-7, of the KNP "MLE and SHMD" ZMR at 80 Peremohy St., Zaporizhzhia
Power supply from autonomous diesel generators
The reconstruction solution involves the modernization and bringing into compliance with the current regulatory requirements of the power supply system to ensure reliable and uninterrupted power supply of the building mechanisms of the clinical hospital with a basement, building A-6, and the medical building, building E-7, of the KNP "MLE and SHMD" ZMR at 80 Peremohy St. in Zaporizhzhia. Within the framework of the implementation of the solution, it is planned to carry out a complex of works on the reconstruction of electrical network elements, the installation and connection of electrical equipment, cable lines and control systems in accordance with the approved design documentation. The implementation of the solution will provide the necessary technical parameters of the power supply, increase the level of reliability and safety of operation, and also create conditions for the timely and safe implementation of works on the reconstruction of the buildings of the healthcare institution.
Budget30'886'351 UAH
Implementation period7 months