Zaporizka

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
All streams
1
Projects
Projects by sectors
1
Projects
Projects by goal
1
Projects
Projects by status
29,72 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status

Current set filters (Filtered result: 1)

Project code: 160126-3E78A5F2
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date01. 2026
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

Reconstruction of internal engineering networks of the Municipal Emergency and Rapid Medical Care Hospital (letter E-7) at 80 Peremohy St. in Zaporizhzhia

Project goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Improving the condition of infrastructure, Improving the quality of services
Geography
Zaporizhzhia city
Initiator
PUBLIC NON-COMMERCIAL ENTERPRISE "CITY HOSPITAL OF EMERGENCY AND URGENT MEDICAL AID" OF ZAPORIZK CITY COUNCIL
Reconstruction of internal engineering networks of the Municipal Emergency and Rapid Medical Care Hospital (letter E-7) at 80 Peremohy St. in Zaporizhzhia
New construction of a separate cryocylinder building of an oxygen station with the arrangement of capital structures and a full set of engineering networks to provide the medical building of the building E-7 of the Municipal Emergency and First Aid Hospital 3MR at 80 Peremohy St. in Zaporizhzhia
The project plans to update and modernize medical gas supply systems, including centralized supply of gaseous medical oxygen, medical air, vacuum, nitrogen, carbon dioxide, as well as anesthetic gas removal systems (AGSS), control and signaling. It is planned to replace outdated pipelines and equipment with modern certified elements with an increased level of reliability and safety. The solution is implemented within the existing building without changing its functional purpose and planning decisions, in compliance with the requirements of labor protection, fire and technogenic safety. The proposed solution provides redundancy of vital systems, reduces the risks of emergency situations and creates conditions for the stable provision of high-quality emergency and medical care.
Budget29'723'494 UAH
Implementation period7 months

In focus

All news