Tiachivska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
1
Projects
Projects by sectors
1
Projects
Projects by goal
1
Projects
Projects by status
2,84 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status
Stream

Current set filters (Filtered result: 1)

Project code: 060226-DF6107F6
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date02. 2026
SectorEnergy Sector
SubsectorRenewable energy and alternative fuels
StatusInvestment Feasibility Study

Reconstruction of the power supply system of the Tyachiv MKZ "SPORTS ARENA" building at the address Tyachiv, Vajdy St., 15 by installing a rooftop solar power plant with a capacity of 119.5 kW

Project goal
Increasing compliance with modern standards. Creation of new facilities and services, Поява нових виробничих потужностей
Geography
Tiachivska community
Initiator
TYACHIV CITY MUNICIPAL ESTABLISHMENT "SPORTS ARENA"
Reconstruction of the power supply system of the Tyachiv MKZ "SPORTS ARENA" building at the address Tyachiv, Vajdy St., 15 by installing a rooftop solar power plant with a capacity of 119.5 kW
"Construction of solar carports on the territory of the MKZ "Sportivna Arena Tyachiv" with connection to internal networks (approximately 120 kW)"
The project involves the modernization of the power supply of the MKZ "Sportivna Arena" building in Tyachiv by installing a rooftop solar power plant with a capacity of 119.5 kW to cover the institution's own needs. The work includes the installation of photovoltaic panels on the roof, inverter equipment, electrical panels and protective automation, laying cable lines, installing grounding and surge protection systems with connection to the facility's internal networks. The expected result is a sustainable and economical power supply for the sports arena, reducing electricity costs, increasing the energy independence and reliability of the facility's operation, as well as reducing CO₂ emissions by replacing part of the electricity consumption with "green" generation. The estimated annual output of the solar power plant will be about 140.7 thousand kWh.
Budget2'841'159 UAH
Implementation period6 months