Mukachivska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
69
Projects
Projects by sectors
69
Projects
Projects by goal
69
Projects
Projects by status
2'057,43 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Project cost
Status

Current set filters (Filtered result: 69)

Project code: 020326-AA24189D
Initiation date
Project cost
Status
Local level of SPP
Local level of SP
Date03. 2026
SectorEducation and science
SubsectorPreschool education
StatusInvestment Feasibility Study

Major repairs of the power supply system (installation of solar panels) of Mukachevo Preschool Education Institution No. 1 of the Mukachevo City Council of the Transcarpathian region at the address: Mukachevo, Mytropolyta Volodymyra St., 10

Project Goal
Introducing innovations and energy-efficient solutions. Increasing compliance with modern standards
Geography
Mukachevo city
Initiator
Department of Education, Culture, Youth and Sports of the Mukachiv City Council
Maturity level
76
Major repairs of the power supply system (installation of solar panels) of Mukachevo Preschool Education Institution No. 1 of the Mukachevo City Council of the Transcarpathian region at the address: Mukachevo, Mytropolyta Volodymyra St., 10
Replacement of the power supply system (installation of solar panels) of Mukachevo Preschool Education Institution No. 1 of the Mukachevo City Council of the Transcarpathian region at the address: Mukachevo, Mytropolyta Volodymyra St., 10
The project involves a major overhaul of the power supply system of Mukachevo Preschool Education Institution No. 1 at the address: Mukachevo, Mytropolyta Volodymyra St., 10, with the installation of solar panels on the roof of the building. The building is two-story with a hip roof, on which 88 HI-MO6 LR8-66HGD 610M solar panels with a capacity of 610 W each will be mounted, with a total capacity of 53.68 kW (per panel) and 50 kW (per inverter). The system includes a SUN-50KSG01HP3-EU-BM4 inverter with a rated output of 50 kW and a switchboard for connecting the power plant. All electrical solutions comply with the requirements of current regulations, taking into account safety, fire and sanitary and hygienic rules. The purpose of the project — ensuring a reliable and environmentally friendly power supply to the institution through the use of renewable solar energy, which will reduce the consumption of traditional electricity and increase the autonomy of the institution. The installation of solar panels will be carried out by a specialized construction organization in compliance with all necessary norms and standards.
Project cost2'397'360 UAH
Implementation period10 months

In focus

All news