13
Projects
Projects by sectors
13
Projects
Projects by goal
13
Projects
Projects by status
613,29 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date10. 2025
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

New construction of a sewer network from Yevhen Konovalets St. to Lesi Ukrainky St. in the town of Zvyahel, Zhytomyr region

Project goal
Creation of new facilities and services. Increasing compliance with modern standards, Improving the equality of wealth distribution, Improving the quality of services, Meeting demand
Geography
Novohrad-Volynska community, Zviahel city
Initiator
DEPARTMENT OF HOUSING AND COMMUNITY MANAGEMENT AND ENVIRONMENT OF THE ZVIAGEL CITY COUNCIL
Laying a sewer network from plastic pipes
Laying a sewer network from concrete pipes
Laying 1338 meters of plastic pipes with a diameter of 500 mm using the open excavation method. Laying 103 meters of plastic pipes with a diameter of 500 mm using the horizontal directional drilling method. Connection (reconnection) of the existing collector that discharges wastewater from consumers.
Budget29'275'391 UAH
Implementation period13 months
Local level of SPP
Local level of SP
Date10. 2025
SectorHealthcare
SubsectorSpecialized medical care
StatusPreliminary Investment Feasibility Studyy

Reconstruction (partial thermo-modernization) of the medical building No. 2 of the Zvyagel Multispecialty Hospital

Project goal
Increasing compliance with modern standards. Improving the condition of infrastructure, Introducing innovations and energy-efficient solutions, Improving the quality of services
Geography
Novohrad-Volynska community, Zviahel city
Initiator
Communal non-profit enterprise "Zvyahelsk Multidisciplinary Hospital" of the Zvyahelsk City Council
Insulation of the facade and basement, replacement of the roof with attic insulation, modernization of the building's ventilation system
Building facade insulation
The project includes the following main types of work: Roof replacement with attic insulation (1375 sq m) Facade and basement insulation (3134 sq m) Modernization of the building's ventilation system
Budget64'432'218 UAH
Implementation period18 months
Local level of SP
Date10. 2025
SectorCulture and information
SubsectorCultural Heritage and National Memory
StatusInvestment Feasibility Study

Repair and restoration works with elements of reconstruction and adaptation of the architectural monument of local importance - Zvyahelsky Castle, in order to preserve the cultural heritage and develop the tourist infrastructure of the community, ensuring barrier-free access

Project goal
Rebuilding the damaged/destroyed. Increasing compliance with modern standards, Improving the condition of infrastructure, Ensuring inclusiveness and equal opportunities, Meeting demand
Geography
Zhytomyrska region
Initiator
DEPARTMENT OF CULTURE AND TOURISM OF THE ZVIAGEL CITY COUNCIL
Repair and restoration works with elements of reconstruction and adaptation of the monument
Improvement of the area around the facility
1. Restoration and strengthening of foundations, walls, ceilings and roof structures. Restoration of historical facade elements (platbands, cornices, decorative masonry). Restoration or replacement of doors, openings, windows in a style that matches the authentic appearance of the monument. Cleaning and treatment of external and internal walls with special restoration mixtures. 2. Partial reconstruction: Restoration or reconstruction of emergency internal partitions and ceilings. Installation of new engineering systems (electricity, ventilation, water supply, sewage). Installation of sanitary and hygienic units, common rooms. 3. Adaptation to modern needs: Arrangement of an inclusive entrance and ways of movement inside the building. Installation of ramps, handrails, tactile indicators. Adaptation of individual premises for public space, co-working or exhibition area. Improvement of the area around the object. Arrangement of an observation deck with a descent to the river. Upgrading the security system (alarm, video surveillance, evacuation exits). 4. Finishing works: Restoration of historical interiors (if possible). Painting, decorative decoration of walls and ceilings in accordance with the restoration passport. Arrangement of a new floor (parquet, tiles or other suitable materials). 5. External and internal lighting: Installation of energy-efficient lighting, including architectural lighting of the facade.
Budget13'350'000 UAH
Implementation period18 months
Local level of SPP
Local level of SP
Date10. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Providing secondary education institutions with teaching aids and equipment within the framework of the implementation of the "New Ukrainian School" reform

Project goal
Increasing compliance with modern standards. Ensuring inclusiveness and equal opportunities, Improving the quality of services
Geography
Novohrad-Volynska community
Initiator
DEPARTMENT OF EDUCATION AND SCIENCE OF THE ZVIAGEL CITY COUNCIL
Providing secondary education institutions with teaching aids and equipment within the framework of the implementation of the "New Ukrainian School" reform at the expense of the state budget
Providing secondary education institutions with teaching aids and equipment within the framework of the implementation of the "New Ukrainian School" reform at the expense of grant funds
This alternative solution involves the purchase of teaching aids and equipment for secondary education institutions within the framework of the "New Ukrainian School" reform, financed from the state budget and co-financing from the budget of the territorial community.
Budget15'000'000 UAH
Implementation period39 months
Local level of SPP
Local level of SP
Date10. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Project "Installation of a fire alarm system, a people evacuation control system (in terms of the fire alarm system and evacuation direction indicators) and a centralized fire monitoring system for the premises of Gymnasium No. 2 of the Zvyahel City Council at the address: Zhytomyr region, Zvyahel district, Zvyahel city, Franka Ivana st., building 19"

Project goal
Increasing compliance with modern standards. Increasing compliance with modern standards
Geography
Zviahel city
Initiator
GYMNASIUM № 2 OF ZVYAGEL CITY COUNCIL
Installation of a fire alarm system, an evacuation control system (in terms of the fire alarm system and evacuation direction indicators) and a centralized fire monitoring system for the premises of Gymnasium No. 2 of the Zvyahelsk City Council
Installation of an addressable fire alarm system
An alternative technical solution involves the use of modern addressable analog technologies to create a comprehensive fire safety system for an educational institution.
Budget529'500 UAH
Implementation period13 months
Local level of SPP
Local level of SP
Date10. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

"Installation of a fire alarm system, an evacuation control system (in terms of the fire alarm system and evacuation direction indicators) and a centralized fire monitoring system for the premises of Gymnasium No. 3 of the Zvyahel City Council at the address: Zhytomyr region, Zvyahel district, Zvyahel city, Sobornosti st., building 54"

Project goal
Increasing compliance with modern standards. Improving the condition of infrastructure
Geography
Zhytomyrska region
Initiator
GYMNASIUM No. 3 of the Zvyagel City Council
Installation of a fire alarm system, an evacuation control system (in terms of the fire alarm system and evacuation direction indicators) and a centralized fire monitoring system for the premises of Gymnasium No. 3 of the Zvyahel City Council at the address: Zhytomyr region, Zvyahel district, Zvyahel city, Sobornosti str., building 54
Installation of a fire alarm system, evacuation control system (in terms of the fire alarm system and evacuation direction indicators)
The project involves the installation of a fire alarm system to localize fires in the initial stages in enclosed spaces without human intervention. It is planned to install fire detectors, a sound and light alarm, and an emergency lighting lantern. The implementation of this project will ensure safe conditions for the educational process.
Budget900'000 UAH
Implementation period18 months
Local level of SP
Date10. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Installation of a fire alarm system, an evacuation control system (in terms of the fire alarm system and evacuation direction indicators) and a centralized fire monitoring system for the premises of Gymnasium No. 10 of the Zvyahel City Council at the address: Zhytomyr region, Zvyahel district, Zvyahel city, Hetman Sahaidachnogo st., building 215

Project goal
Improving the condition of infrastructure.
Geography
Zhytomyrska region
Initiator
GYMNASIUM № 10 OF THE ZVIAGEL CITY COUNCIL
Installation of a fire alarm system, an evacuation control system (in terms of the fire alarm system and evacuation direction indicators) and a centralized fire monitoring system for the premises of Gymnasium No. 10 of the Zvyahel City Council at the address: Zhytomyr region, Zvyahel district, Zvyahel city, Hetman Sahaidachnogo st., building 215
Wireless fire alarm systems
Addressable (discrete) PLCs
Installation of a fire alarm system, an evacuation control system (in terms of the fire alarm system and evacuation direction indicators) and a centralized fire monitoring system for the premises of Gymnasium No. 10 of the Zvyahel City Council at the address: Zhytomyr region, Zvyahel district, Zvyahel city, Hetman Sahaidachnogo st., building 215
Budget1'121'198,4 UAH
Implementation period24 months
Local level of SP
Date10. 2025
SectorMunicipal infrastructure and services
SubsectorDistrict Heating
StatusInvestment Feasibility Study

Reconstruction of heating networks with replacement of emergency sections with pre-insulated pipes with polyurethane foam insulation of the Zvyagelteplo heating and cooling enterprise in the city of Zvyagel, Zhytomyr region (length 1250 linear meters)

Project goal
Improving the quality of services. Increasing compliance with modern standards, Improving the condition of infrastructure
Geography
Zviahel city
Initiator
UTILITY ENTERPRISE OF THE ZVYAGEL CITY COUNCIL "ZVYAGELTEPLO"
Reconstruction of heating networks with replacement of emergency sections with pre-insulated pipes with polyurethane foam insulation of the Zvyagelteplo heating and cooling enterprise in the city of Zvyagel, Zhytomyr region (length 1250 linear meters)
Reconstruction of heating networks with replacement of emergency sections with pre-insulated pipes with polyurethane foam insulation of the Zvyagelteplo heating and cooling enterprise in the city of Zvyagel, Zhytomyr region (length 1250 linear meters) (alternative option)
The use of pre-insulated pipelines with polyurethane insulation in a polyethylene sheath is proposed. This solution is based on proven district heating technologies and meets modern requirements for energy efficiency and durability.
Budget9'661'420 UAH
Implementation period13 months
Local level of SP
Date10. 2025
SectorMunicipal infrastructure and services
SubsectorDistrict Heating
StatusInvestment Feasibility Study

Reconstruction of heating networks with replacement of emergency sections with pipes pre-insulated with polyurethane foam insulation of the Zvyagelteplo heating and cooling enterprise in the city of Zvyagel, Zhytomyr region (in the central part of the city - 614 sq.m.)

Project goal
Improving the quality of services. Increasing compliance with modern standards, Improving the condition of infrastructure
Geography
Zviahel city
Initiator
UTILITY ENTERPRISE OF THE ZVYAGEL CITY COUNCIL "ZVYAGELTEPLO"
Reconstruction of heating networks with replacement of emergency sections with pipes pre-insulated with polyurethane foam insulation of the Zvyagelteplo heating and cooling enterprise in the city of Zvyagel, Zhytomyr region (in the central part of the city - 614 sq.m.)
Reconstruction of heating networks with replacement of emergency sections with pipes pre-insulated with polyurethane foam insulation of the Zvyagelteplo heating and cooling enterprise in the city of Zvyagel, Zhytomyr region (in the central part of the city - 614 sq.m.) (alternative option)
The use of pre-insulated pipelines with polyurethane insulation in a polyethylene sheath is proposed. This solution is based on proven district heating technologies and meets modern requirements for energy efficiency and durability.
Budget4'440'343 UAH
Implementation period13 months
Local level of SP
Date10. 2025
SectorEnvironment
SubsectorWaste management, including radioactive waste
StatusPreliminary Investment Feasibility Studyy

Construction of a solid waste landfill

Project goal
Creation of new facilities and services. Increasing compliance with modern standards, Meeting demand
Geography
Novohrad-Volynska community
Initiator
DEPARTMENT OF HOUSING AND COMMUNITY MANAGEMENT AND ENVIRONMENT OF THE ZVIAGEL CITY COUNCIL
Use of complexes for separate collection and sorting
Without the use of separate collection and sorting complexes
Automated and manual waste sorting to extract secondary raw materials (paper, plastic, glass, metals). Processing of the organic fraction of waste (food scraps, garden waste) to obtain: compost (organic fertilizer) and/or biogas (fermentation). This technical solution is aimed at extending the life of the landfill and its subsequent closure.
Budget71'600'000 UAH
Implementation period36 months