Zhytomyrska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
58
Projects
Projects by sectors
58
Projects
Projects by goal
58
Projects
Projects by status
18'986,55 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Project cost
Status
Stream

Current set filters (Filtered result: 58)

Project code: 190226-D5FE53C3
Initiation date
Project cost
Status
Local level of SPP
Local level of SP
Date02. 2026
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

Construction of a new line of pressure sewer collector from the State Water Supply and Sewerage Administration (16 Ivan Gonty St.) to KOS-1 – KOS-2 in the city of Zhytomyr. 2nd stage (correction)

Project Goal
Improving the quality of services.
Geography
Zhytomyr city
Initiator
DEPARTMENT OF MUNICIPAL ECONOMY OF ZHYTOMYR CITY COUNCIL
Maturity level
77
Construction of a new line of pressure sewer collector from the State Water Supply and Sewerage Administration (16 Ivan Gonty St.) to KOS-1 – KOS-2 in the city of Zhytomyr. 2nd stage (correction)
Maintaining the existing network
New treatment facilities with a capacity of 62 thousand m3 per day will allow all capacities to be transferred to one site outside the city and to treat wastewater in accordance with European directives and standards. Automation of processes and the operation of exceptionally energy-efficient equipment will allow significant savings in the wastewater treatment process. Completion of the reconstruction of sewage treatment facilities 2 will allow decommissioning of sewage treatment facilities 1. All wastewater entering the Main Sewerage Pumping Station (MSPS) is pumped through a collector with a diameter of 1000 mm, which runs through the territory of the sewage treatment facilities (STP 1). Then one strand of the specified collector runs to sewage treatment facilities 2 (STP 2). Emergency backup collectors are present only between the GKNS site and OSK 1. To switch to operation only OSK 2 and discontinue the use of the OSK 1 site, it is necessary to build a backup sewer collector line with a length of 2,500 m between these sites, which is planned as the second stage of construction of the project.
Project cost170'702'174 UAH
Implementation period36 months