Zhytomyrska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
146
Projects
Projects by sectors
146
Projects
Projects by goal
146
Projects
Projects by status
37'829,41 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Initiator
Project cost
Status
Initiation date
Project cost
Status
Local level of SP
Date04. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Creation of a modern educational space by Lyceum No. 1 of Zhytomyr

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards
Geography
Zhytomyr city
Initiator
DEPARTMENT OF EDUCATION OF ZHYTOMYR CITY COUNCIL
Creation of a modern educational space by Lyceum No. 1 of Zhytomyr
Creating a modern educational space
The project directly corresponds to strategic documents of the state and local levels, in particular the Concept of the "New Ukrainian School", which envisages the creation of a modern educational environment equipped with digital and laboratory learning tools.
Project cost6'097'658 UAH
Implementation period13 months
Local level of SP
Date04. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Providing Lyceum No. 24 of Zhytomyr with teaching aids and equipment within the framework of the implementation of the “New Ukrainian School” reform

Project Goal
Increasing compliance with modern standards. Improving the quality of services, Meeting demand
Geography
Zhytomyrska community
Initiator
Lyceum No. 24 of Zhytomyr
Providing Lyceum No. 24 of Zhytomyr with teaching aids and equipment within the framework of the implementation of the “New Ukrainian School” reform
Providing ZZSO with training materials and equipment within the framework of the implementation of the “New Ukrainian School” reform
Updating the modern educational space, inconsistency/lack ofequipment, which makes it impossible to ensure the educational process at the level ofmodern standards.
Project cost1'761'045 UAH
Implementation period13 months
Local level of SP
Date04. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Providing Lyceum No. 23 of Zhytomyr named after M. Ocheret with teaching aids and equipment within the framework of the implementation of the NUS reform

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Improving the quality of services
Geography
Zhytomyrska community, Zhytomyr city
Initiator
Lyceum No. 23 of the city of Zhytomyr named after M. Ochereta
Purchase of furniture, teaching aids and equipment for the laboratory
Purchase of alternative teaching aids and laboratory equipment
Purchase of furniture, teaching aids and equipment for the laboratory
Project cost1'761'046 UAH
Implementation period13 months
Local level of SP
Date04. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Providing Lyceum No. 21 of Zhytomyr with teaching aids and equipment as part of the implementation of the NUS reform

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards
Geography
Zhytomyr city
Initiator
Lyceum No. 21 of the city of Zhytomyr
Providing Lyceum 21 with teaching aids and equipment as part of the implementation of the NUS reform
Providing Lyceum 21 with teaching aids and equipment as part of the implementation of the NUSh reform with tablets
Providing Lyceum 21 with teaching aids and equipment as part of the implementation of the NUS reform
Project cost1'761'045 UAH
Implementation period13 months
Local level of SPP
Local level of SP
Date02. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Creation of an educational space within the "New Ukrainian School" and a pilot educational institution - Lyceum No. 34 (obtaining specialized secondary education in an academic direction) of the Zhytomyr city territorial community

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards
Geography
Zhytomyr city
Initiator
DEPARTMENT OF EDUCATION OF ZHYTOMYR CITY COUNCIL
Maturity level
88
Creation of an educational space within the "New Ukrainian School" and a pilot educational institution - Lyceum No. 34 (obtaining specialized secondary education in an academic direction) of the Zhytomyr city territorial community
Educational space within the "New Ukrainian School" and the pilot institution
Updating the modern educational space, inconsistency of equipment, which makes it impossible to ensure the educational process at the level of modern standards
Project cost21'284'440 UAH
Implementation period18 months
Local level of SP
Date02. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Creation of an educational space within the "New Ukrainian School" of the Zhytomyr urban territorial community

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards
Geography
Zhytomyr city
Initiator
DEPARTMENT OF EDUCATION OF ZHYTOMYR CITY COUNCIL
Creation of an educational space within the "New Ukrainian School" of the Zhytomyr urban territorial community
Educational space within the "New Ukrainian School"
Updating the modern educational space, inconsistency of equipment, which makes it impossible to ensure the educational process at the level of modern standards.
Project cost6'984'400 UAH
Implementation period18 months
Local level of SPP
Local level of SP
Date02. 2026
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

Construction of a new line of pressure sewer collector from the State Water Supply and Sewerage Administration (16 Ivan Gonty St.) to KOS-1 – KOS-2 in the city of Zhytomyr. 2nd stage (correction)

Project Goal
Improving the quality of services.
Geography
Zhytomyr city
Initiator
DEPARTMENT OF MUNICIPAL ECONOMY OF ZHYTOMYR CITY COUNCIL
Maturity level
77
Construction of a new line of pressure sewer collector from the State Water Supply and Sewerage Administration (16 Ivan Gonty St.) to KOS-1 – KOS-2 in the city of Zhytomyr. 2nd stage (correction)
Maintaining the existing network
New treatment facilities with a capacity of 62 thousand m3 per day will allow all capacities to be transferred to one site outside the city and to treat wastewater in accordance with European directives and standards. Automation of processes and the operation of exceptionally energy-efficient equipment will allow significant savings in the wastewater treatment process. Completion of the reconstruction of sewage treatment facilities 2 will allow decommissioning of sewage treatment facilities 1. All wastewater entering the Main Sewerage Pumping Station (MSPS) is pumped through a collector with a diameter of 1000 mm, which runs through the territory of the sewage treatment facilities (STP 1). Then one strand of the specified collector runs to sewage treatment facilities 2 (STP 2). Emergency backup collectors are present only between the GKNS site and OSK 1. To switch to operation only OSK 2 and discontinue the use of the OSK 1 site, it is necessary to build a backup sewer collector line with a length of 2,500 m between these sites, which is planned as the second stage of construction of the project.
Project cost170'702'174 UAH
Implementation period36 months
Local level of SP
Date02. 2026
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

Construction of a new line of pressure sewer collector from the State Water Supply and Sewerage Administration (16 Ivan Gonty St.) to KOS-1 – KOS-2 in the city of Zhytomyr. 2nd stage (correction)

Project Goal
Improving the quality of services.
Geography
Zhytomyrska community, Zhytomyr city
Initiator
DEPARTMENT OF MUNICIPAL ECONOMY OF ZHYTOMYR CITY COUNCIL
Construction of a new line of pressure sewer collector from the State Water Supply and Sewerage Administration (16 Ivan Gonty St.) to KOS-1 – KOS-2 in the city of Zhytomyr. 2nd stage (correction)
Maintaining the existing network
The reconstruction of the treatment facilities will solve 2 important problems for the city: environmental and economic. New treatment facilities with a capacity of 62 thousand m3 per day will allow transferring all capacities to one site outside the city and purifying wastewater in accordance with European directives and standards. Automation of processes and operation of exceptionally energy-efficient equipment will allow significant savings in the wastewater treatment process. Completion of the reconstruction of the sewage treatment facilities 2 will allow decommissioning of the sewage treatment facilities 1. All wastewater entering the Main Sewerage Pumping Station (SPS) is pumped through a collector with a diameter of 1000 mm, which runs through the territory of the sewage treatment facilities (STP 1). Then one thread of the specified collector runs to the sewage treatment facilities 2 (STP 2). Emergency backup collectors are present only between the GKNS site and OSK 1. To switch to operation only OSK 2 and discontinue the use of the OSK 1 site, it is necessary to build a backup sewer collector line with a length of 2,500 m between these sites, which is planned as the second stage of construction of the project.
Project cost170'702'174 UAH
Implementation period36 months
State level of SP
Local level of SPP
Local level of SP
Date02. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Major renovation of the catering unit of Lyceum No. 4 of the city of Zhytomyr at the address: Zhytomyr, Troyanivska St., 26

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Introducing innovations and energy-efficient solutions
Geography
Zhytomyr city
Initiator
Lyceum No. 4 of the city of Zhytomyr
Maturity level
83
Major renovation of the catering unit of Lyceum No. 4 of the city of Zhytomyr at the address: Zhytomyr, Troyanivska St., 26
New construction of the catering unit of the municipal institution Lyceum No. 4 of the city of Zhytomyr at 26 Troyanivska Street
Implementation of major repairs of the catering unit at the address: Zhytomyr, Troyanivska St., 26. The project involves updating the structures of the premises, modernizing engineering networks (electricity, water supply, heating, ventilation), replacing and updating the technological equipment of the catering unit, as well as ensuring compliance with sanitary and hygienic standards. The goal is to improve the conditions for preparing and serving food, increase energy efficiency, and reduce operating costs.
Project cost18'124'296 UAH
Implementation period17 months
Local level of SPP
Local level of SP
Date02. 2026
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

Reconstruction of the operating block of the surgical building of the municipal enterprise "Hospital No. 2 named after V.P. Pavlusenko" of the ZhMR at the address: Zhytomyr, R. Shukhevycha St., 2a

Project Goal
Improving the quality of services. Increasing compliance with modern standards, Increasing compliance with modern standards
Geography
Zhytomyrska region
Initiator
DEPARTMENT OF CAPITAL CONSTRUCTION OF ZHYTOMYR CITY COUNCIL
Maturity level
83
Reconstruction of the operating block of the surgical building of the KP "Hospital No. 2 named after V.P. Pavlusenko" ZhMR at the address: Zhytomyr, st. R. Shukhevych, 2a
Modernization of the operating room of the surgical building of the municipal enterprise "Hospital No. 2 named after V.P. Pavlusenko" to improve the quality and safety of medical services
The project involves a complete reconstruction of the operating room of the surgical building
Project cost28'202'212 UAH
Implementation period22 months

In focus

All news