Overhaul (energy saving measures) Overhaul (energy saving measures) of the Andrushivka preschool educational institution "Sonechko". The project's objective is to implement energy-efficient measures. We strive to update the institution so that it becomes even more comfortable, cozy and environmentally friendly for our children. "Sonechko" - is a place where little hearts are filled with warmth, knowledge and inspiration. 1) Works on the basement: - dismantling of the basement decoration; - dismantling of the existing blind area around the building. - arranging insulation of the basement with slabs - after insulating the basement, arrange an asphalt concrete blind area with a slope from the walls of the building;
2) Works on the external walls: - dismantling of the existing plaster of the "fur coat" facade; - to eliminate traces of mold on the walls and basement, treat the masonry with an antifungal primer. - preparation of external walls; - arrangement of a facade thermal insulation system of the type - wet facade with mineral wool boards - decoration of walls with plaster, painting. 3) Roof: - dismantle the roof from asbestos-cement sheets - dismantle the wooden battens and fillies of the rafter system, - arrange for the repair of existing brick ventilation shafts - before starting work on insulating the attic floor, dismantle the existing thermal insulation from expanded clay gravel to the floor slabs. - perform vapor barrier insulation of the floor with sealing joints. - arrange for the insulation of the attic floor with mineral wool boards - install new wooden elements of the rafter system with partial use of existing elements; - install a waterproofing film; - arrange a new roof in axes "1-2" and "3-4" from a metal profile on wooden battens and rafters; - arrange dormer windows on the roof; - install an organized drainage system, snow retainers; dismantle the existing metal fire escape and install a new fire escape; - arrange lightning protection for the roof, heating of the drainage system and cornices; - dismantle the roll roof of the transition between the blocks in axes - to arrange a single-pitched roof, build up the parapet - insulate the roof with mineral plates
4) Porches, canopies: - dismantle existing porches; - install new porches with a fence in accordance with current standards and working project drawings. - mark the first and last steps of the porches with stripes - install tactile stripes parallel to the passage in front of the steps - install an information tactile sign near the main entrance: - install lifts for MGN near two porches; - repair reinforced concrete canopies above the porches and restore the protective layer and concrete chips in accordance with the «Technology for repairing load-bearing reinforced concrete structures».
5) External evacuation stairs: - dismantle existing metal evacuation stairs; - install new metal evacuation stairs according to the detailed design drawings
Project cost13'357'930 UAH
Implementation period28 months