Project code: 150126-C06DDDF5
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date01. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Major repairs of the civil defense protective structure (CSP) of Andrushivka Lyceum No. 2 of the Andrushivka City Council at the address: Zhytomyr region, Berdychiv district, Andrushivka city, Zazulinskoho street 7b

Project Goal
Increasing compliance with modern standards. Improving the condition of infrastructure, Ensuring inclusiveness and equal opportunities, Improving the quality of services
Geography
Andrushivka city
Initiator
Andrushiv Lyceum No. 2 of Andrushiv City Council, Berdychiv District, Zhytomyr Region
Maturity level
82
Major repairs of the civil defense structure (CDS)
Shelter repair
The design solutions provide for the redevelopment of the shelter premises.Installation of new brick partitions and foundations for them. Installation of monolithic reinforced concrete pits and reinforced floors. The design provides for the installation of a second evacuation exit. Installation of hermetic and reinforced hermetic doors at the entrances to the shelter is planned. In addition, the design provides for the installation of ventilation systems with monolithic reinforced concrete ventilation shafts. Installation of metal jumpers is planned for the installation of new openings and holes in the load-bearing walls. In order to improve the aesthetic appearance of the PRU premises, a complex of finishing works is planned, which includes replacing the finishing of walls and ceilings and repairing the floor covering. Door replacement and installation of sanitary partitions.Two entrances and exits are designed for the shelter, each of which leads directlyto the outside. One of the entrances is equipped with an inclined lift for MGN.
Project cost11'881'952 UAH
Implementation period3 months