Pavlohradska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
24
Projects
Projects by sectors
24
Projects
Projects by goal
24
Projects
Projects by status
3'011,84 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status
Initiation date
Budget
Status
State level of SP
Local level of SPP
Local level of SP
Date10. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

New construction of a civil defense protective structure (CPS) of Lyceum No. 17 of the Pavlohrad City Council at the address: 71A Centralna Street, Pavlohrad, Dnipropetrovsk Region

Project Goal
Creation of new facilities and services. Increasing compliance with modern standards, Improving the equality of wealth distribution, Improving the condition of infrastructure, Ensuring inclusiveness and equal opportunities, Improving the quality of services, Reducing territorial or social gaps, Meeting demand
Geography
Pavlohrad city
Initiator
LYCEUM № 17 OF THE PAVLOGRAD CITY COUNCIL
Maturity level
73
New construction of a civil defense structure (CDS) for 500 people by Lyceum No. 17 of the Pavlohrad City Council
Construction of a modular prefabricated civil defense structure (CDS) on the territory of the lyceum
The proposed solution involves the construction of a modern civil defense shelter designed for 500 people, which will provide safe conditions for students (887 children) and employees (80 people) of Lyceum No. 17. The new structure will meet the requirements of the State Code of Civil Protection and the State Emergency Service of Ukraine, will be equipped with ventilation, water supply, sewage, backup power supply, lighting and communication systems. The project will allow: to eliminate the critical shortage of safe places (currently there are only shelters for 110 people, which is less than 12% of the need); to guarantee the continuity of the educational process in conditions of military threats; to ensure inclusiveness and accessibility for low-mobility population groups; to create a multifunctional space that can be used for educational and sports needs of the community in peacetime.
Project cost138'260'000 UAH
Implementation period13 months
Local level of SPP
Local level of SP
Date10. 2025
SectorEnvironment
SubsectorWater protection, water management development, flood risk mitigation, centralized water supply, management, use and restoration of surface water resources
StatusPreliminary Investment Feasibility Study

"Restoration of the hydrological regime by clearing the Vovcha River bed in the area of the city beach on the territory of the May 1st Park in Pavlohrad. Major repairs"

Project Goal
Contribution to climate or environmental goals. Improving the equality of wealth distribution
Geography
Pavlohradska community, Pavlohrad city
Initiator
DEPARTMENT OF MUNICIPAL ECONOMY AND CONSTRUCTION OF THE PAVLOGRAD CITY COUNCIL
Maturity level
69
"Restoration of the hydrological regime by clearing the Vovcha River bed in the area of the city beach on the territory of the May 1st Park in Pavlohrad. Major repairs"
introduction of aquatic organisms (launching fish to clean the river bottom)
Clearing the Vovcha River bed 630 m
Project cost50'350'698 UAH
Implementation period18 months
Local level of SPP
Local level of SP
Date10. 2025
SectorTransport Sector
SubsectorRoad transport and road infrastructure
StatusPreliminary Investment Feasibility Study

Reconstruction of the road along Hromadyanska Street (from Poltava Street, buildings 69, 71 to Tsentralna Street, buildings 44, 50) in Pavlohrad, Dnipropetrovsk region

Project Goal
Improving the condition of infrastructure. Improving the equality of wealth distribution
Geography
Pavlohradska community, Pavlohrad city
Initiator
DEPARTMENT OF MUNICIPAL ECONOMY AND CONSTRUCTION OF THE PAVLOGRAD CITY COUNCIL
Maturity level
69
Reconstruction of the road along Hromadyanska Street (from Poltavska Street, buildings 69, 71 to Tsentralna Street, buildings 44, 50) Pavlohrad, Dnipropetrovsk region
ongoing repair
work on the reconstruction of the intra-district road
Project cost50'500'100 UAH
Implementation period18 months
Local level of SPP
Local level of SP
Date10. 2025
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

"Reconstruction of the oxygen supply system with the replacement of the pipeline and the laying of oxygen networks and the installation of an oxygen station of the KNP "Pavlograd City Hospital No. 1" of the PMR at the address: 102 Shevchenko St., Pavlograd, Dnipropetrovsk region"

Project Goal
Increasing compliance with modern standards. Improving the equality of wealth distribution, Improving the quality of services
Geography
Pavlohradska community, Pavlohrad city
Initiator
MUNICIPAL NON-COMMERCIAL ENTERPRISE "PAVLOGRAD CITY HOSPITAL No. 1" OF THE PAVLOGRAD CITY COUNCIL
Maturity level
77
"Reconstruction of the oxygen supply system with the replacement of the pipeline and the laying of oxygen networks and the installation of an oxygen station of the KNP "Pavlograd City Hospital No. 1" of the PMR at the address: 102 Shevchenko St., Pavlograd, Dnipropetrovsk region"
Construction of an oxygen supply system
The designed oxygen station will serve as a source of oxygen supply for the obstetrics and gynecology department and the gynecology and surgery department of the hospital where patients are located who require a vital amount of oxygen, especially in cases where the human respiratory system cannot provide a sufficient supply of oxygen naturally.
Project cost15'350'000 UAH
Implementation period18 months
Local level of SPP
Local level of SP
Date10. 2025
SectorHousing
SubsectorHousing Reconstruction
StatusPreliminary Investment Feasibility Study

Reconstruction of the dormitory at 28 Zavodska Street, Pavlohrad

Project Goal
Improving the condition of infrastructure. Rebuilding the damaged/destroyed
Geography
Pavlohradska community, Pavlohrad city
Initiator
DEPARTMENT OF MUNICIPAL ECONOMY AND CONSTRUCTION OF THE PAVLOGRAD CITY COUNCIL
Maturity level
69
Reconstruction of the dormitory at 28 Zavodska Street, Pavlohrad
Construction of temporary housing
The project envisages the redevelopment of dormitory rooms into individual apartments, accommodating up to 150 people, including internally displaced persons and low-mobility population groups.
Project cost301'000'000 UAH
Implementation period36 months
Local level of SPP
Local level of SP
Date10. 2025
SectorTransport Sector
SubsectorRoad transport and road infrastructure
StatusPreliminary Investment Feasibility Study

"Overhaul of the overpass on Dniprovska Street at the intersection with the Pokrovsk – Pavlograd-1 railway in the city of Pavlograd"

Project Goal
Improving the condition of infrastructure. Improving the equality of wealth distribution
Geography
Pavlohradska community, Pavlohrad city
Initiator
DEPARTMENT OF MUNICIPAL ECONOMY AND CONSTRUCTION OF THE PAVLOGRAD CITY COUNCIL
Maturity level
69
"Overhaul of the overpass on Dniprovska Street at the intersection with the Pokrovsk – Pavlograd-1 railway in the city of Pavlograd"
Passage through the road overpass at the intersection of Dniprovska Street with the Pavlohrad-Pokrovsk railway line
The project involves the implementation of major repairs to the overpass on Dniprovska Street at the intersection with the Pokrovsk – Pavlograd-1 railway in the city of Pavlograd
Project cost601'500'000 UAH
Implementation period36 months
Local level of SPP
Local level of SP
Date10. 2025
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

"Reconstruction of the water supply pipeline on Ozerna Street in Pavlohrad". Correction

Project Goal
Improving the condition of infrastructure. Improving the quality of services
Geography
Pavlohradska community, Pavlohrad city
Initiator
DEPARTMENT OF MUNICIPAL ECONOMY AND CONSTRUCTION OF THE PAVLOGRAD CITY COUNCIL
Maturity level
68
"Reconstruction of the water supply pipeline on Ozerna Street in Pavlohrad". Correction
Alternative sources of drinking water supply
Providing consumers with high-quality drinking water by performing underground laying of a water supply pipeline 1925.56 m long using polyethylene pipelines with high hydraulic characteristics
Project cost18'401'323 UAH
Implementation period4 months
Local level of SPP
Local level of SP
Date10. 2025
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

"Overhaul of the water supply pipeline on Shakhtobudivnyky Ave. in Pavlohrad." Correction

Project Goal
Improving the condition of infrastructure. Improving the quality of services
Geography
Pavlohradska community, Pavlohrad city
Initiator
DEPARTMENT OF MUNICIPAL ECONOMY AND CONSTRUCTION OF THE PAVLOGRAD CITY COUNCIL
Maturity level
68
"Overhaul of the water supply pipeline on Shakhtobudivnyky Ave. in Pavlohrad." Correction
Alternative sources of drinking water supply
Providing consumers with high-quality drinking water by performing underground laying of a 995 m long water supply pipeline using polyethylene pipelines with high hydraulic characteristics
Project cost9'171'630 UAH
Implementation period4 months
Local level of SPP
Local level of SP
Date10. 2025
SectorHousing
SubsectorHousing Reconstruction
StatusPreliminary Investment Feasibility Study

"Reconstruction of the dormitory on Promyslova Street, 9/2 in Pavlohrad, Dnipropetrovsk region (housing for internally displaced persons)"

Project Goal
Improving the condition of infrastructure. Rebuilding the damaged/destroyed
Geography
Pavlohrad city
Initiator
DEPARTMENT OF MUNICIPAL ECONOMY AND CONSTRUCTION OF THE PAVLOGRAD CITY COUNCIL
Maturity level
69
Reconstruction of the dormitory on the street Promyslova, 9/2 in the city of Pavlograd, Dnipropetrovsk region (housing for internally displaced persons)
Construction of temporary housing
The project envisages the redevelopment of dormitory rooms into 63 individual apartments, of which 46 apartments are 1-room apartments, 17 apartments are 2-room apartments, with accommodation for up to 170 internally displaced persons, including low-mobility population groups.
Project cost72'443'977 UAH
Implementation period15 months
Local level of SPP
Local level of SP
Date10. 2025
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

"Reconstruction of Pavlohrad Water Intake Phase I, Dnipropetrovsk Region, Pavlohrad District, Pryvovchanske Village, Nadrichna St. 59"

Project Goal
Increasing compliance with modern standards. Capacity building
Geography
Troitska community, Pryvovchanske village
Initiator
DEPARTMENT OF MUNICIPAL ECONOMY AND CONSTRUCTION OF THE PAVLOGRAD CITY COUNCIL
Maturity level
79
"Reconstruction of Pavlohrad Water Intake Phase I, Dnipropetrovsk Region, Pavlohrad District, Pryvovchanske Village, Nadrichna St. 59"
Water supply from DMP VKG "Dnipro-Western Donbas"
Reconstruction of the water intake with an increase in the flow rate of water extraction, increasing the reliability of service provision.
Project cost257'178'035 UAH
Implementation period19 months

In focus

All news