Project code: 100226-F72E62D0
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date02. 2026
SectorMunicipal infrastructure and services
SubsectorDevelopment and Reconstruction of Subnational Infrastructure
StatusInvestment Feasibility Study

Energy saving measures. Reconstruction of the boiler room and connection to engineering networks at the address: Televiziyna Street, 3n, Kryvyi Rih, Dnipropetrovsk region

Project goal
Improving the quality of services. Contribution to climate or environmental goals, Increasing compliance with modern standards, Increasing compliance with modern standards, Creation of new facilities and services, Improving the equality of wealth distribution, Increasing the even distribution of resources, Introducing innovations and energy-efficient solutions, Meeting demand
Geography
Kryvorizka community, Kryvyi Rih city
Initiator
UTILITY ENTERPRISE OF HEAT NETWORKS "KRYVORIZHTPLOMEREZHA"
Energy saving measures. Reconstruction of the boiler room and connection to engineering networks at the address: Televiziyna Street, 3n, Kryvyi Rih, Dnipropetrovsk region
Energy saving measures. Reconstruction of the boiler room with the installation of solid fuel boilers and connection to engineering networks at the address: Televeziyna Street, 3n, Kryvyi Rih, Dnipropetrovsk region
The boiler room is designed to provide heat for heating systems and ventilation of consumers.The operating mode of the boiler room is the heating season.The technical re-equipment project of the boiler room provides for a "weather-dependent" operating schedule for heat supply, the efficiency class of regulation is "C" according to DSTU DSTU B A.2.2-8:2010.According to the Design Task:- The maximum load on the heating and ventilation system is 58.5 Gcal/h (68 MW);- Heat losses in heating networks (12%) - 7 Gcal/h (8.2 MW);- Water heating costs in the boiler room (VPU), (1%) - 0.6 Gcal/h (0.7 MW);- Expenses for fuel needs, (0.5%) – 0.3 Gcal/h(0.3 MW);Installed capacity of the boiler house, which is designed – 80.94 MW.
Budget1'212'427'976,5 UAH
Implementation period30 months