Kryvorizka

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
1
Projects
Projects by sectors
1
Projects
Projects by goal
1
Projects
Projects by status
Project code
Keyword
Budget
Status
Stream

Current set filters (Filtered result: 1)

Project code: 060426-5D2D1899
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date04. 2026
SectorMunicipal infrastructure and services
SubsectorDevelopment and Reconstruction of Subnational Infrastructure
StatusInvestment Feasibility Study

Development of design and estimate documentation Energy saving measures. Reconstruction of the Central boiler house with the installation of a cogeneration gas piston unit at the address: 5000, Ukraine, Dnipropetrovsk region, Kryvyi Rih, Rudna st., 53

Project Goal
Improving the quality of services. Contribution to climate or environmental goals, Increasing compliance with modern standards, Increasing compliance with modern standards, Creation of new facilities and services, Improving the equality of wealth distribution, Increasing the even distribution of resources, Improving the condition of infrastructure, Introducing innovations and energy-efficient solutions, Meeting demand
Geography
Kryvorizka community, Kryvyi Rih city
Initiator
UTILITY ENTERPRISE OF HEAT NETWORKS "KRYVORIZHTPLOMEREZHA"
Maturity level
76
Development of design and estimate documentation Energy saving measures. Reconstruction of the Central boiler house with the installation of a cogeneration gas piston unit at the address: 5000, Ukraine, Dnipropetrovsk region, Kryvyi Rih, Rudna st., 53
Energy saving measures. Reconstruction of the Central boiler house with the installation of solid fuel boilers at the address: 5000, Ukraine, Dnipropetrovsk region, Kryvyi Rih, Rudna st., 53
KPTM «Kryvorizhteplomerezha» produces and supplies thermal energy for the needs of heating and hot water supply of the population, municipal facilities and industrial enterprises of the city of Kryvyi Rih, and also operates and maintains equipment and networks in working condition. Boiler house «Central» KPTM «Kryvorizhteplomerezha» is designed to meet the needs of heating, hot water supply and superheated steam of residential, municipal and industrial facilities. Boiler house «Central» was put into operation in 1962 . At the current time, the boiler house produces 155625.069 Gcal/year of thermal energy. Currently, the boiler house is operated by the following equipment: gas-fired water boilers KV-GM-100-150 – 1 unit. and PTVM-100-150 - 3 units; as well as steam gas boilers DKVR-10-13 - 2 units and DKVR-20-13 - 1 unit. The total thermal capacity of the equipment is 494 MW. The planned activities include the installation of two cogeneration gas piston units (CPU) of modular and container design manufactured by JENBACHER and other auxiliary equipment, as well as the replacement of existing pumping equipment in the existing boiler house as backup sources for the production of electricity and heat.
Project cost297'468'663 UAH
Implementation period24 months

In focus

All news