Development of design and estimate documentation Energy saving measures. Reconstruction of the Central boiler house with the installation of a cogeneration gas piston unit at the address: 5000, Ukraine, Dnipropetrovsk region, Kryvyi Rih, Rudna st., 53 Energy saving measures. Reconstruction of the Central boiler house with the installation of solid fuel boilers at the address: 5000, Ukraine, Dnipropetrovsk region, Kryvyi Rih, Rudna st., 53
KPTM «Kryvorizhteplomerezha» produces and supplies thermal energy for the needs of heating and hot water supply of the population, municipal facilities and industrial enterprises of the city of Kryvyi Rih, and also operates and maintains equipment and networks in working condition. Boiler house «Central» KPTM «Kryvorizhteplomerezha» is designed to meet the needs of heating, hot water supply and superheated steam of residential, municipal and industrial facilities. Boiler house «Central» was put into operation in 1962 . At the current time, the boiler house produces 155625.069 Gcal/year of thermal energy. Currently, the boiler house is operated by the following equipment: gas-fired water boilers KV-GM-100-150 – 1 unit. and PTVM-100-150 - 3 units; as well as steam gas boilers DKVR-10-13 - 2 units and DKVR-20-13 - 1 unit. The total thermal capacity of the equipment is 494 MW. The planned activities include the installation of two cogeneration gas piston units (CPU) of modular and container design manufactured by JENBACHER and other auxiliary equipment, as well as the replacement of existing pumping equipment in the existing boiler house as backup sources for the production of electricity and heat.
Project cost297'468'663 UAH
Implementation period24 months