The hospital building is 3-storey, with a technical floor and a basement under the entire area of the building. Functional composition and list of premises according to the Medical Task. The project provides for the implementation of the following works: - restoration of ceiling surfaces; - restoration of wall surfaces; - arrangement of the floor; - replacement of windows, external and internal doors with the installation, laying, expansion of door and window openings, if necessary; - roof repair; - replacement of furniture, medical and technical equipment; - video surveillance system, personnel call buttons and Internet network; - after major repairs, the production of a new technical passport of the building; - replacement of the lighting network, socket networks; - replacement of the ventilation network; - replacement of the water supply and sewage network with the installation of plumbing fixtures; - arrangement of entrance groups with accessibility elements for MGN; - replacement of the elevator; - performance of work on repairing building structures according to the recommendations of the Technical Report on the examination and assessment of the technical condition of load-bearing structures;
Project cost76'642'356 UAH
Implementation period13 months